Projects
ICRC superintends and regulates PPPs in Nigeria
Projects Under Custody (Post-Contract)
LIST OF PUBLIC PRIVATE PARTNERSHIP (PPP) AGREEMENTS/CONTRACTS UNDER THE COMMISSION’S CUSTODY AS OF JULY 2024
S/N | Infrastructure Sector | Numbers | |||
1 | Ports Infrastructure Sector | 26 | |||
2 | Healthcare Infrastructure Sector | 2 | |||
3 | Public Building Infrastructure Sector | 2 | |||
4 | Inland Container Depot Infrastructure Sector | 6 | |||
5 | Telecommunications (Fibre Optic) Infrastructure Sector | 2 | |||
6 | Aviation Infrastructure Sector | 5 | |||
7 | Housing Development Infrastructure Sector | 4 | |||
8 | Defence/Paramilitary/Security Infrastructure Sector | 3 | |||
9 | Information Technology and Communication Infrastructure Sector | 9 | |||
10 | Electricity (Hydro & Solar) Infrastructure Sector | 5 | |||
11 | Agriculture Infrastructure Sector | 20 | |||
12 | Road/Highway Infrastructure Sector | 9 | |||
13 | Marine and Blue Economy (Offshore Waste Management) | 2 | |||
Total No of PPP Contracts
| 95 | ||||
S/N | PROJECT NAME | GOVT AGENCY | CONCESSIONAIRE | DURATION | STATUS |
Ports Infrastructure Sector | |||||
LAGOS PORT COMPLEX | |||||
1 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)
| Nigerian Ports Authority (NPA) | Apapa Bulk Terminal Ltd “A” | 25years 3rd April 2006 – 2nd April 2031 | Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
2 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)
| Nigerian Ports Authority (NPA) | Apapa Bulk Terminal Ltd “B” | 25years 3rd April 2006 – 2nd April 2031 | Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
3 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)
| Nigerian Ports Authority (NPA) | ENL Consortium Ltd (Terminal C) | 10 years (Initially) 2006 – 2016
* Extension of additional 5 years granted to expire in 2021 | Under Review for Contract Renewal
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.
|
4 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)
| Nigerian Ports Authority (NPA) | ENL Consortium Ltd (Terminal D) | 10 years (Initially) 2006 – 2016
* Extension of additional 5 years granted to expire in 2021 | Under Review for Contract Renewal
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
5 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)
| Nigerian Ports Authority (NPA) | Greenview Development Nigeria Ltd (Terminal E) | 25 years 3rd April 2006 – 2nd April 2031
| Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
6
| Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa) | Nigerian Ports Authority (NPA)
| APMT Terminals Apapa Ltd
| 25 years 20th March 2006 -19th March 2031
| Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.
|
TIN CAN PORT COMPLEX | |||||
7 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)
| Nigerian Ports Authority (NPA) | Five Star Logistics Ltd | 15 years (Initially) 10th May 2006- 2nd May 2021
* Extension of additional 5yrs granted to expire 2nd May 2026
| Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
8 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island) | Nigerian Ports Authority (NPA) | Ports and Terminal Multi-Service Ltd | 25 years 18th August 2009 -17 August 2034 | Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
9 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)
| Nigerian Ports Authority (NPA) | Ports and Cargo Handlings Services Ltd | 15 years (Initially) 10th May 2006 – 9th May 2021
* Extension of additional 5 years granted to expire in 2026 | Under Review for Contract Renewal
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
10 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)
| Nigerian Ports Authority (NPA) | Tincan Island Container Terminal Ltd (TCIT) | 15 years (Initially) 1st June 2006 – 31st May 2021
* Extension of additional 5 years granted to expire in 2026 | Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.
|
11 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)
| Nigerian Ports Authority (NPA) | Josepdam Ports Services Nig Ltd | 15 years (Initially) 11th May 2006 – 10th May 2021
*Extension of additional 5yrs granted to expire in 2026 | Under Review for Contract Renewal
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
ONNE PORT COMPLEX | |||||
12 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)
| Nigerian Ports Authority (NPA) | Brawal Oil Services Ltd | 25 years 6th August 2006 – 5th August 2031 | Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
13 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)
| Nigerian Ports Authority (NPA) | West African Container Terminal Ltd (WACT) | 25 years 1st September, 2007 -31st August, 2032 | Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
14 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)
| Nigerian Ports Authority (NPA) | Intels Nigeria Ltd (Onne- FLT) | 25 years 22nd June 2006 – 21st June 2031 | Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.
|
15
| Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne) | Nigerian Ports Authority (NPA) | Intels Nigeria Ltd (Onne – FOT)
| 25 years 22nd June 2006 – 21st June 2031 | Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
CALABAR PORT COMPLEX | |||||
16 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Calabar)
| Nigerian Ports Authority (NPA) | Intels Nigeria Ltd (Calabar) | 25 years 21 June 2007 – 20th June 2032 | Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
17 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Calabar)
| Nigerian Ports Authority (NPA) | Shoreline Logistics Nigeria Ltd (Addax Logistics Nig Limited) | 25 years 26th May 2007 – 25th May 2032 | Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
18 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Calabar)
| Nigerian Ports Authority (NPA) | Ecomarine (ECM) Terminals Ltd | Initially 25 years 1st August 2007 – 31st July 2032
* Extension of additional 5 years granted to expire in 2037
| Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
DELTA PORT COMPLEX | |||||
19 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)
| Nigerian Ports Authority (NPA) | Intels Nigeria Ltd (Terminal A -Warri) | 25 years 21st June 2006 – 22nd June 2031 | Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
20 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)
| Nigerian Ports Authority (NPA) | Intels Nigeria Ltd (Terminal B -Warri) | 25 years 21st June 2006 – 22nd June 2031
| Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
21 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)
| Nigerian Ports Authority (NPA) | Associated Maritime Services Ltd | Initially 15 years 11th June 2006 -10th June 2021
* Extension of additional 5 years granted to expire in 2026 | Under Review for Contract Renewal
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
22 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)
| Nigerian Ports Authority (NPA) | Julius Berger Services Nigeria Ltd | 25 years 1st April 2007 – 31 March 2032 | Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.
|
23 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal B Old Port (Warri) | Nigerian Ports Authority (NPA) | Ocean & cargo Terminal Services
| 25 years 22nd February, 2019 21st February, 2044
| Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.
|
RIVERS PORT COMPLEX | |||||
24 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Port Harcourt)
| Nigerian Ports Authority (NPA) | Port and Terminal Operators Nig Ltd | Initially 15 years 23rd June 2006 -22nd June 2021.
* Extension of additional 5 years granted to expire in 2026
| Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
25 | Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Port Harcourt)
| Nigerian Ports Authority (NPA) | BUA Ports and Terminals Ltd | 20 years 9th August 2006 – 8th August 2026 | Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.
|
Lekki Deep-Water Port Complex
| |||||
26 | Development and Operation of Deep-Water Port (Lekki, Lagos) | Lekki Port LFTZ Enterprise Limited | The Nigerian Ports Authority/Lagos State Government | 45 years (April 21st 2011 – April 20th 2056)
Renewable for another 25 years with a 5-year notification period before the expiration of the contract. | Operational Phase
§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment. |
Healthcare Infrastructure Sector
| |||||
27 | Concession for the Operation, Management and Provision of Primary, Secondary and Tertiary Health Care at the Garki Hospital Abuja
| Federal Capital Territory Administration (FCTA) | NISA Premier Hospital Ltd | 15 years from 20th March 2007 To 19th March 2022 | Contract Expired (Undergoing Hand-back Process)
§ The Garki Contract was executed to provide primary, secondary and tertiary health care in an efficient and commercially viable manner, in accordance with the terms and conditions of the agreement.
|
28 | Concession for the operation and maintenance of two Warehouses located in Lagos Federal Central Medical Warehouse and Abuja Premier Medical Warehouse, through an Operate and Management contract (Warehouse in a Box) | Federal Ministry of Health | MDS Logistics Limited
| 5 years 14th May 2019 – 13 May 2024 | Operational Phase
§ The Operations and Management Contract was executed to provide turn-key medical warehousing services for sustainable Health commodities storage in the pharmaceutical based grade medical warehousing facilities.
|
Public Building Infrastructure Sector
| |||||
29 | Concession for the renovation of 18 Blocks Student Hostel of the Kaduna Polytechnic
| Mark Point Project Limited
| The Kaduna Polytechnic
| The contract is for 14 years from the effective date.
21st August 2020 - 20th August 2034.
| Implementation is stalled
§ The Contract is to provide affordable hostel accommodation facilities management for the students of Kaduna Polytechnic.
|
30 | Concession Agreement for the Design, Finance, Build, Operate and Transfer of the National Hajj Commission of Nigeria Building Complex in Kano, kano State
| National Hajj Commission of Nigeria (NAHCON) | Did Al Amana Hajj House Market Kano Limited | The contract is for 35 years. 7th September, 2022 - 2057
| Construction Phase
§ The Contract is for the construction and management of 608 modern lock-up stores on the Hajj Commission Land in Kano State. |
Inland Container Depot Infrastructure Sector
| |||||
31
| Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Abia State)
| Nigerian Shippers Council (NSC) | Eastgate Inland Container Depot Ltd | 30 years 2007 - 2037 | Contract is under review by the Parties
The purpose of the Concession contract are as follows: § To provide an inland location for the trans-shipment of sea cargo to inland destinations. § Providing quick and safe access to port facilities from inland transport networks connected by road or rail. § To provide solutions to logistic issues the decongestion of goods at the main seaports by increasing storage facilities and terminals at the inland dry port.
|
32 | Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Oyo State) | Nigerian Shippers Council (NSC) | Catamaran Logistics Ltd | 25 years 2007 -2032 | Contract is under review by the Parties
The purpose of the Concession contract are as follows: § To provide an inland location for the trans-shipment of sea cargo to inland destinations. § Providing quick and safe access to port facilities from inland transport networks connected by road or rail. § To provide solutions to logistic issues the decongestion of goods at the main seaports by increasing storage facilities and terminals at the inland dry port.
|
33 | Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Plateau State) | Nigerian Shippers Council (NSC) | Duncan Maritime Ventures Nigeria Ltd | 25 years 2007 - 2032 | Contract is under review by the Parties
The purpose of the Concession contract are as follows: § To provide an inland location for the trans-shipment of sea cargo to inland destinations. § Providing quick and safe access to port facilities from inland transport networks connected by road or rail. § To provide solutions to logistic issues and the decongestion of goods at the main seaports by increasing storage facilities and terminals at the inland dry port.
|
34 | Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Kano State) | Nigerian Shippers Council (NSC) | Dala Inland Dry Port Nigeria Ltd | 25 years 2007 - 2032 | Contract is under review by the Parties
The purpose of the Concession contract are as follows: § To provide an inland location for the trans-shipment of sea cargo to inland destinations. § Providing quick and safe access to port facilities from inland transport networks connected by road or rail. § To provide solutions to logistic issues the decongestion of goods at the main seaports by increasing storage facilities and terminals at the inland dry port.
|
35 | Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Katsina State) | Nigerian Shippers Council (NSC) | Equatorial Marine Oil and Gas Company Ltd | 25 years 2007 - 2032 | Contract is under review by the Parties
The purpose of the Concession contract are as follows: § To provide an inland location for the trans-shipment of sea cargo to inland destinations. § Providing quick and safe access to port facilities from inland transport networks connected by road or rail. § To provide solutions to logistic issues the decongestion of goods at the main seaports by increasing storage facilities and terminals at the inland dry port.
|
36 | Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Borno State) | Nigerian Shippers Council (NSC) | Migfo Nigeria Limited | 25 years 2007 - 2032 | Contract is under review by the Parties
The purpose of the Concession contract are as follows: § To provide an inland location for the trans-shipment of sea cargo to inland destinations. § Providing quick and safe access to port facilities from inland transport networks connected by road or rail. § To provide solutions to logistic issues the decongestion of goods at the main seaports by increasing storage facilities and terminals at the inland dry port. |
Telecommunications (Fibre Optic) Infrastructure Sector
| |||||
37 | Concession Agreement for the Design, Build, Finance, Operate TCN’s Fibre Optic Cable Telecommunications Infrastructure for the Western part of Nigeria
| Transmission Company of Nigeria | Phase 3 Telecom Ltd | 15 Years March 2006 -2021. Parties have mutually extended the contract for twenty (20) years to expire on 30th November 2040 | Operational Phase
§ The project is to develop, upgrade and commercialise the existing TCN’s fibre optic network and facilities to provide a cost-effective telecommunication infrastructure for more efficient attainment of its corporate goals. |
38 | Concession Agreement for the Design, Build, Finance, Operate TCN’s Fibre Optic Cable Telecommunications Infrastructure for the Eastern part of Nigeria
| Transmission Company of Nigeria | Alheri Engineering Services L td | 15 Years March 2006 -2021 Parties have mutually extended the contract for twenty (20) years to expire on 30th November 2040 | Operational Phase
§ The contract is to develop, upgrade and commercialise the existing TCN’s fibre optic network and facilities to provide a cost-effective telecommunication infrastructure for more efficient attainment of its corporate goals. |
Aviation Infrastructure Sector | |||||
39 | Concession to Design, Develop, Finance, Construct, Complete, Test, Commission, Operate, Manage, Maintain and Transfer the Muritala Muhammed Airport II, Ikeja – Lagos Domestic Terminal (Lagos)
| The Federal Airports Authority of Nigeria (FAAN) | Bi -Courtney Ltd | Initially 12 Years April 24th 2003 – April 23rd 2015 | Operational Phase
The project is for the construction and management of an airport terminal that receives domestic flights and provides passenger service operations at the Muritala Muhammed Airport Ikeja - Lagos
|
40
| Concession for the Construction and Development of a Four-Star Hotel at the Muritala Muhammed Airport Ikeja – Lagos | Federal Ministry of Transportation /Federal Airports Authority of Nigeria | Bi -Courtney Ltd | 40 Years September 27th 2005 to September 26th 2045
| Construction stalled
§ The project is for the development of a world-class Four Star Hotel at the Muritala Muhammed Airport Ikeja - Lagos. |
41 | Concession for the Construction and Development of a Conference Centre at the Muritala Muhammed Airport Ikeja - Lagos | Federal Airports Authority of Nigeria | Bi -Courtney Ltd | 40 Years 21st November 2006 – 20th November 2046 | Construction stalled
§ The project is for the development of a world-class Conference Centre at the Muritala Muhammed Airport Ikeja -Lagos.
|
42 | Multi-level Car Park Facility at Murtala Muhammed International Airport, Lagos
The Development of a Multi-level Car Park Facility at Murtala Muhammed International Airport, Lagos | Federal Aviation Authority of Nigeria (FAAN)
| Seymour Aviation Ltd
| 40 years 7th August 2013 -
| Operational Phase
The project is for the development of an affordable and decent multi-level car parking lots at the Murtala Muhammed International Airport, Lagos.
|
43 | Concession for the Maintenance, Repair and Overhaul (MRO) Facility at the MMA, Lagos. The Contract is a Build Operate, Maintain and Transfer model.
| The Federal Ministry of Aviation/Federal Airports Authority of Nigeria (FAAN) | Continental Aircraft Repairs and Maintenance Services Limited | 30 years Inclusive of 4 years Construction period
(10th August, 2023 – 2053)
| Construction Phase
§ The project is aimed at promoting investment and private sector participation in the establishment of a Maintenance, Repair and Overhauling Centre in Nigeria for aircraft.
|
Housing Development Infrastructure Sector
| |||||
44 | Concession Agreement for the Reclamation and Infrastructural Development of FESTAC Phase II Housing Development Project –FESTAC Town, Lagos
| Federal Ministry of Lands, Housing and Urban Development/The Federal Housing Authority (FHA) | New FESTAC Property Development Company Ltd | 30 years 8th September 2014 -7th September 2044 | Construction Phase (Contractual Dispute)
§ The project involves reclamation works, Infrastructure works which will provide land for commercial and residential real estate area in Lagos State. |
45 | Concession contract for the development of the 6.041 hectares of land at Adekunle Fajuyi Way, GRA Lagos into a world-class hotel. The land had hitherto been underutilized
| The Federal Radio Corporation of Nigeria (FRCN) | Fish Valley Investment and Property Ltd
| 55 years (2023-2078)
| Construction Phase
§ The project is to development of the FRCN land in Lagos into a real estate properties. |
46 | Concession for the redevelopment of the 38,500 sqm Deputy Inspector General of Police (DIG) Quarters, Maitama, Abuja.
| The Nigerian Police Force | Cosgrove Investment Ltd
| 60 years 2022 – 2082 with 5 years construction period
| Construction Phase
§ The project is aimed at the redevelopment and complete replacement of the existing dilapidated physical structures at the DIG’s Quarters in Maitama, Abuja with brand new 39-unit Ultra-Modern Super-Luxury real estate with 39 units of five Bedroom Fully Detached Duplexes. |
47 | Concession contract for the Redevelopment of the Nigerian Police Senior Officers Quarters Ikeja, Lagos through Public Private Partnership Arrangement. | The Nigerian Police Force | Blacl Qoral Concepts Limited | 47 years Execution Date: 9th June, 2023
| Construction/Renovation Phase § The project is for the renovation and modernisation of the Senior Police Quarters in Lagos for use by personnel of the Nigerian police force.
|
Defence Infrastructure Sector
| |||||
48 | Public Private Partnership and Joint Venture Agreement for the Establishment of a Military Clothing Factory Kaduna, Kaduna State | Defence Industries Corporation of Nigeria (DICON)
| SUR Corporate Wear Tasarim Dani Manlik GYM SAN VE TIC AS (SUR) Turkey | 50 years 24th October 2019 - | Construction Phase
§ The project is aimed at the construction and equipment of a modern Military Clothing factory and the production of affordable uniforms for security agencies in Nigeria.
|
49 | Concession contract for the Design, Finance, Upgrade, Operate and transfer of the Nigerian Correctional Service Shoe and garment Factories at Aba in Abia State and the Leather (Tannery) Factory at Janguza, Kano State, under a Public Private partnership arrangement. | Nigerian Correctional Service (NCoS) | Erojim Investment Limited | 20 years 13th January 2021- 12th January 2041 | Operational Phase
§ The project is for the construction and rehabilitation of Nigerian Correctional Service Shoe and garment factories in Aba and Kano.
|
50 | Concession contract of the integrated digital trunking communications system designed to provide robust, reliable, secured and independent multimedia communication systems (voice, video and data) for the Nigerian Police Force and other security agencies of Government. | Federal Ministry of Police Affairs | Messrs. MPS Technologies Ltd | 30 years, with the first 36 months designated for rehabilitation work (2021 – 2051).
The contract was signed on the 27th January 2021 | Operational Phase
§ The project is aimed at providing an integrated digital trunking communications system for a robust, reliable, secured and independent multimedia communication (voice, video and data) in Nigeria. |
Information Technology and Communication Infrastructure Sector
| |||||
51 | Concession for the Production of ECOWAS Biometric Identity Cards
| Federal Ministry of Interior | Euphoria Press Limited | 10 years 16th April 2019 – 15 April 2029 | Operational Phase
§ The project is aimed at providing a safe and secure ICT platform for the automation of the Nigerian Immigration Services. |
52 | Concession contract for the Design, Development, and Management of a Secured Ticketing solution for the NRC Rail Services for the Five (5) stations along the NRC rail Corridor between Abuja and Kaduna. | Nigerian Railway Corporation (NRC) | SecureID Limited | 10 years 18th November 2020 - 17th November 2030, subject to any future amendment to the contract term
| Operational Phase
§ The project is aimed at providing a safe and secure e-ticketing platform for train passenger services on the Abuja-Kaduna rail transport system.
|
53 | Concession Agreement for the Process Automation of Citizenship and Business Department (Ecitibiz) using Public-Private Partnership | Federal Ministry of Interior (the Grantor) | Anchor Dataware Solutions Limited | The contract was executed on the 24th of April, 2012 for a contract term of 5 years (2012 – 2017).
Renewed for another 5 years (2017 to 2022)
Renewed for another 3 years (2022 to 2025)
| Operational Phase
§ The project aimed at providing a safe and secure ICT platform to render automated services for marriage registration, expatriate quota registration, naturalization registration and place of worship. |
54 | Concession contract for the Deployment of a Revenue Assurance Solution Platform in the Nigerian Telecommunications Industry | Nigeria Communication Commission (NCC) | 3R Revenue Assurance Solutions Limited (3RRAS) | 15 years 17th June 2022 - 16th June 2037 | Operational Phase
§ The project is to provide a safe and secured ICT platform to harness revenue payable to the Government by telecommunication services providers and to improve telecom services nationwide.
|
55 | Concession contract for the Implementation of the End-To-End Technology Platform for Automation of Nigeria Customs Service’s Business Processes and Upgrading of ITS Infrastructure
(Presidential Initiatives on Customs Modernization “E-Customs Project”)
| The Nigeria Customs Service Board (For and On Behalf of the Federal Government of Nigeria) | E-Customs HC Project Limited | 20 years 28th September 2022 - 27th September 2042
| Operational Phase
§ The project is aimed at providing a safe and secure ICT platform for the processing and payment of customs duties to the Government and the modernization of the NCS operations.
|
56 | Concession contract for Nigeria e-Immigration Solution as part of the Nigerian e-Government Initiative
| Federal Ministry of Interior and National e-Government Strategies Limited
| New-works Solutions and Investment Ltd | Principal Contract signed on 12th December 2007 for a duration of 6 years
This was renewed on 7th March 2013 and commenced on 12th December 2013
This was further renewed in 2019 to expire in 2025
| Operational Phase
§ The project is to provide Biometric visa and visa sorting application centre as part of the Nigerian e-Government Initiative.
|
57 | Concession Agreement in respect of the Police Specialised Services Automation Project (POSSAP) | The Federal Ministry of Police Affairs | Messrs Possap Solutions Limited | The contract was executed on 19th November 2021 for a duration of 10 years (2021 – 2031)
Launched on 2nd June 2022 marking the Commencement of the project implementation.
| Operational Phase
§ The project aimed at providing a safe and secured ICT automated platform to render services of police escorts and guards, firearm licenses, Police extract, Police Character certificates, by the Nigerian Police Force and efficiently manage the revenue streams. |
58 | Concession contract for the Installation, Operation and Maintenance of On-Street Parking Meters for Maitama and Garki Area 1 areas.
| Federal Capital Territory Administration (FCTA) | Automaten Technik Aaumann Nigeria Limited (ATB) | Contract duration: 10 years
4th August 2023 – 3rd August 2033
| Operational Phase
§ The project is aimed at managing upgraded on-street parking services at a fee and maintaining other ancillary activities as provided in the contract. |
59 | Concession contract for the Installation, Operation and Maintenance of On-Street Parking Meters for Wuse II and Utako areas
| Federal Capital Territory Administration (FCTA) | NAJEC Limited | Contract duration: 10 years
4th August 2023 – 3rd August 2033
| Operational Phase
§ The project is aimed at managing upgraded on-street parking services at a fee and maintaining other ancillary activities as provided in the contract. |
Electricity Infrastructure Sector
| |||||
60 | Concession Agreements for the Operation, Maintenance, Design and Sales of electricity produce – Niger State
| Kainji Hydro Electricity Plc | Mainstream Energy Solutions Ltd | 30 Years 21st February 2013 – 20th February 2043 | Operational Phase
§ The project is for the restoration of the generation capacity of the Kainji/Jebba Hydro Damn and to enhance the electricity supply from the national grid.
|
61 | Concession Agreements for the Operation, Maintenance, Design and Sales of electricity produce – Niger State | Shiroro Hydro Electric Plc | North South Power Company Ltd | 30 Years 21st February 2013 – 20th February 2043 | Operational Phase
§ The project is for the restoration of the generation capacity of the Shiroro Hydro Damn and to enhance the electricity supply from the national grid.
|
62 | Concession for the Design, Construction, Install, Operation and Maintain the Dadin Kowa Hyro Dam for Electricity Generation with a capacity of 39 MW – Gombe State | Federal Ministry of Water Resources | Mabon Limited | 25 years from 4th July, 2005 (2005 – 2030)
Addendum to the agreement signed on 4th August 2016
| Operational Phase
§ The project is for the restoration of the generation capacity of the Shiroro Hydro Damn and to enhance the electricity supply from the national grid.
|
63 | Concession of Gurara Hydro Power Project Kaduna Operate and Maintain PPP project (30 Mega Watts) | Federal Ministry of Water Resources | North South Power Company Limited
| 25 years from the commencement date
Contract Signed; 12th May, 2020 (2020 – 2045).
| Rehabilitation Phase
§ The project is for the restoration of the generation capacity of the Gurara Phase I Hydro Damn and to enhance the electricity supply from the national grid.
|
64 | Concession for the Service Management of Gurara Phase 1 Multipurpose Dam Facilities
| Federal Ministry of Water Resources | Messrs Gams and Abell Ltd, in Conjunction with Ryzyn Global Inc. USA
| 10 years 30th December 2019 – 29th December 2029
| Operational Phase
§ The project is for the Operation and Management contract of the Gurara Phase I Hydro Dam infrastructure/facilities and other connected services including irrigation services, water supply, agriculture, etc.
|
Agriculture (Silos- Storage) Infrastructure Sector
| |||||
65 | Concession of Grain Storage Facilities for food storage (Silos) in Ado Ekiti | Federal Ministry of Agriculture and Rural Development | Agro-Universal Consortium
| 10 Years 2018 - 2028 | Not Operational
The Silo project is to carry out the following: i. Take delivery of grain products for stage ii. Clean, dry, convey, grade, process and handle the grain products iii. Ship out the grain products to the processing centres.
|
66 | Concession of Grain Storage Facilities for food storage (Silos) in Akure | Federal Ministry of Agriculture and Rural Development | Agro-Universal Consortium
| 10 Years 2018 - 2028 | Not Operational
The Silo project is to carry out the following: i. Take delivery of grain products for stage ii. Clean, dry, convey, grade, process and handle the grain products iii. Ship out the grain products to the processing centres.
|
67 | Concession of Grain Storage Facilities for food storage (Silos) in Gaya | Federal Ministry of Agriculture and Rural Development | Agro-Universal Consortium
| 10 Years 2018 - 2028 | Not Operational
The Silo project is to carry out the following: i. Take delivery of grain products for stage ii. Clean, dry, convey, grade, process and handle the grain products iii. Ship out the grain products to the processing centres.
|
68 | Concession of Grain Storage Facilities for food storage (Silos) in Ikenne | Federal Ministry of Agriculture and Rural Development | Agro-Universal Consortium
| 10 Years 2018 - 2028 | Operational Phase
The Silo project is to carry out the following: i. Take delivery of grain products for stage ii. Clean, dry, convey, grade, process and handle the grain products iii. Ship out the grain products to the processing centres.
|
69 | Concession of Grain Storage Facilities for food storage (Silos) in Jos | Federal Ministry of Agriculture and Rural Development | Agro-Universal Consortium
| 10 Years 2018 - 2028 | Not Operational
The Silo project is to carry out the following: i. Take delivery of grain products for stage ii. Clean, dry, convey, grade, process and handle the grain products iii. Ship out the grain products to the processing centres.
|
70 | Concession of Grain Storage Facilities for food storage (Silos) in Ogoja | Federal Ministry of Agriculture and Rural Development | Agro-Universal Consortium
| 10 Years 2018 - 2028 | Not Operational
The Silo project is to carry out the following: i. Take delivery of grain products for stage ii. Clean, dry, convey, grade, process and handle the grain products iii. Ship out the grain products to the processing centres.
|
71 | Concession of Grain Storage Facilities for food storage (Silos) in Sokoto | Federal Ministry of Agriculture and Rural Development | Agro-Universal Consortium
| 10 Years 2018 - 2028 | Not Operational
The Silo Silo project is project is to carry out the following: i. Take delivery of grain products for stage ii. Clean, dry, convey, grade, process and handle the grain products iii. Ship out the grain products to the processing centres.
|
72 | Concession of Grain Storage Facilities for food storage (Silos) in Igbariam | Federal Ministry of Agriculture and Rural Development | Coscharis Farms Limited
| 10 Years 2018 - 2028 | Operational Phase
The Silo project is to carry out the following: i. Take delivery of grain products for stage ii. Clean, dry, convey, grade, process and handle the grain products iii. Ship out the grain products to the processing centres.
|
73 | Concession of Grain Storage Facilities for food storage (Silos) in Ezillo | Federal Ministry of Agriculture and Rural Development | Ebony Agro Industries Ltd
| 10 Years 2018 - 2028 | Not Operational
The Silo project is to carry out the following: i. Take delivery of grain products for stage ii. Clean, dry, convey, grade, process and handle the grain products iii. Ship out the grain products to the processing centres.
|
74 | Concession of Grain Storage Facilities for food storage (Silos) in Ibadan | Federal Ministry of Agriculture and Rural Development | Independent Ltd
| 10 Years 2018 - 2028 | Operational Phase
The Silo project is to carry out the following: i. Take delivery of grain products for stage ii. Clean, dry, convey, grade, process and handle the grain products iii. Ship out the grain products to the processing centres.
|
75 | Concession of Grain Storage Facilities for food storage (Silos) in Bulasa | Federal Ministry of Agriculture and Rural Development | Matrixville Consortium Ltd
| 10 Years 2018 - 2028 | Operational Phase
The Silo project is to carry out the following: i. Take delivery of grain products for stage ii. Clean, dry, convey, grade, process and handle the grain products iii. Ship out the grain products to the processing centres.
|
76 | Concession of Grain Storage Facilities for food storage (Silos) in Jahun | Federal Ministry of Agriculture and Rural Development | Matrixville Consortium Ltd
| 10 Years 2018 - 2028 | Not Operational
The Silo project is to carry out the following: i. Take delivery of grain products for stage ii. Clean, dry, convey, grade, process and handle the grain products iii. Ship out the grain products to the processing centres.
|
77 | Concession of Grain Storage Facilities for food storage (Silos) in Kaduna | Federal Ministry of Agriculture and Rural Development | Matrixville Consortium Ltd
| 10 Years 2018 - 2028 | Not Operational
The Silo project is to carry out the following: i. Take delivery of grain products for stage ii. Clean, dry, convey, grade, process and handle the grain products iii. Ship out the grain products to the processing centres.
|
78 | Concession of Grain Storage Facilities for food storage (Silos) in Kwali, | Federal Ministry of Agriculture and Rural Development | Matrixville Consortium Ltd
| 10 Years 2018 - 2028 | Operational Phase
The Silo project is to carry out the following: i. Take delivery of grain products for stage ii. Clean, dry, convey, grade, process and handle the grain products iii. Ship out the grain products to the processing centres.
|
79 | Concession of Grain Storage Facilities for food storage (Silos) in Lafiagi, | Federal Ministry of Agriculture and Rural Development | Matrixville Consortium Ltd
| 10 Years 2018 - 2028 | Not Operational
The Silo project is to carry out the following: i. Take delivery of grain products for stage ii. Clean, dry, convey, grade, process and handle the grain products iii. Ship out the grain products to the processing centres.
|
80 | Concession of Grain Storage Facilities for food storage (Silos) in Gombe | Federal Ministry of Agriculture and Rural Development | Servewell Agricultural Services Limited | 10 Years 2018 - 2028 | Operational Phase
The Silo project is to carry out the following: i. Take delivery of grain products for stage ii. Clean, dry, convey, grade, process and handle the grain products iii. Ship out the grain products to the processing centres.
|
81 | Concession of Grain Storage Facilities for food storage (Silos) in Makurdi | Federal Ministry of Agriculture and Rural Development | Upland Grains Ltd
| 10 Years 2018 - 2028 | Operational Phase Silo project is to carry out the following: i. Take delivery of grain products for stage ii. Clean, dry, convey, grade, process and handle the grain products iii. Ship out the grain products to the processing centres.
|
82 | Concession contract for the Redevelopment of the Ogun-Osun River Basin Development Authority Complex (K’Maroun), Ijora Lagos. | Ogun Osun River Basin Development Authority | Messrs. Asiko GT Property Company Limited | 20 years 13th October 2022 - 12th October 2042
| Construction Phase
The project is to rehabilitate existing office structures and construction of modern facilities for business and commercial purposes. |
83 | Lease Agreement between the Federal Ministry of Agriculture and Rural Development and Alfin Fisheries Limited for the Finance, rehabilitation, and Operation of the Federal Coastal Fishery Terminal, Ebughu, Akwa Ibom State
| Federal Ministry of Agriculture and Rural Development | Alfin Fisheries Limited | 11 years (inclusive of 1 year moratorium period)- 2023 - 2034 Effective Date: 5th May 2023 | Rehabilitation Phase
§ The project is to rehabilitation and modernisation of the coastal terminal as a major fishing hub in Nigeria.
|
84 | Concession contract of the Federal Government of Nigeria, on the Cassava/Bio-Mass Bioethanol Value Chain Project in the Six (6) Geo-Political Zones in Nigeria. | The Federal Government of Nigeria, represented by the Federal Ministry of Finance, Budget and National Planning (FMFBNP) | Biosources and Technologies Limited | 5 years
22nd May, 2023 -21st May, 2028
Addendum to the agreement signed on 23rd May 2023
| Operational Phase
§ The project is aimed at establishing the Cassava Bioethanol Value Chain in the Six (6) geo-political zones in Nigeria.
|
Road Infrastructure Projects (HDMI) – Transport Sector | |||||
85 | Highway Development & Management Initiative (HDMI) Concession Contract for Route 1, Benin – Asaba 125Km
| Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria
| Concessionaire: Africa Plus Partner Nigeria Limited Consortium
SPV: Benin-Asaba Expressway Concession Company Ltd` | 25 years
May, 2023 - May, 2048
| Contract Renegotiation Phase
§ The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximising the use of Federal roads along the right of way and developing other highway furniture.
|
86 | Highway Development & Management Initiative (HDMI) Concession Contract for Route 2 – (Abuja – Lokoja), 93Km
| Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria
| Concessionaire: Avia Infrastructure Services Ltd Consortium
SPV: Highstream Road Networks Limited | 25 years
May, 2023 - May, 2048
| Contract Renegotiation Phase
§ The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximising the use of Federal roads along the right of way and developing other highway furniture.
|
87 | Highway Development & Management Initiative (HDMI) Concession Contract for Route 4, Onitsha – Owerri – Aba, 161Km
| Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria
| Concessionaire: Enyimba Economic City Development Company Consortium
SPV: EECD INFRA Consortium Limited | Duration: 25 years
May, 2023 - May, 2048
| Contract Renegotiation Phase
§ The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximising the use of Federal roads along the right of way and developing other highway furniture.
|
88 | Highway Development & Management Initiative (HDMI) Concession Contract for Route 5, Shagamu – Benin - 258Km
| Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria
| Concessionaire: Africa Finance Corporation Consortium
SPV: Olumo-Bronze Corridor Concession Company | 25 years
May, 2023 - May, 2048
| Contract Renegotiation Phase
§ The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximising the use of Federal roads along the right of way and developing other highway furniture. |
89 | Highway Development & Management Initiative (HDMI) Concession Contract for Route 5 Expansion of 5.4Km of Abuja – Keffi Expressway and Dualisation of Keffi – Akwanga – Lafia – Makurdi Road, 227.2Km
| Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria
| Concessionaire: China Harbour Engineering Company Nigeria Ltd
SPV: China Harbour Nigeria Operation and Maintenance Company Ltd | 25 years
May 2023 -May 2048 | Contract Renegotiation Phase
§ The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximise the use of Federal roads along the right of way and developing other highway furniture.
|
90 | Highway Development & Management Initiative (HDMI) Concession Contract for Route 7A Kano – Maiduguri (Kano _Shuari) 100Km
| Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria
| Concessionaire: Dafac Consortium Limited
SPV: Messrs Dafac Consortium Limited | 25 years
May, 2023 - May, 2048 | Contract Renegotiation Phase
§ The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximising the use of Federal roads along the right of way and developing other highway furniture.
|
91 | Highway Development & Management Initiative (HDMI) Concession Contract for Route 9 – Enugu Portharcourt, 200Km
| Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria
| Concessionaire: Enyimba Economic City Development Company Consortium
SPV: EECD INFRA Consortium Limited | 25 years
May, 2023 - May, 2048 | Contract Renegotiation Phase
§ The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximising the use of Federal roads along the right of way and developing other highway furniture.
|
92 | Highway Development & Management Initiative (HDMI) Concession Contract for Route 11, Lagos – Otta – Abeokuta, 80Km
| Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria
| Concessionaire: Africa Plus Partners Nigeria Limited Consortium
SPV: Lagos -Abeokuta Highway Concession | 25 years
May, 2023 - May, 2048 | Contract Renegotiation Phase
§ The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximising the use of Federal roads along the right of way and developing other highway furniture.
|
93 | Highway Development & Management Initiative (HDMI) Concession Contract for Route 12, Lagos – Badabry – Seme Border, 79Km
| Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria
| Concessionaire: Africa Finance Corporation Consortium
SPV: Eko-Freedom Road Concession Company | 25 years
May, 2023 - May, 2048 | Contract Renegotiation Phase
§ The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximising the use of Federal roads along the right of way and developing other highway furniture.
|
Marine and Blue Economy Sector (Offshore Waste Management)
| |||||
94. | Concession Contract for the Implementation of Offshore Waste Reception Facility at the Eastern Zone Areas
The Procurement and Deployment of Offshore Waste Collection System (PSV Type
Design, Financing, Construction, Procurement, and Development of an Onshore Waste Processing and Safe Recycling and Disposal Facility and System | The Nigerian Maritime Administration and Safety Agency (NIMASA) | XPO Marine Services Ltd | Execution Date: May, 2023
An Initial Implementation/Construction period from the Effective date and ending 5 years thereafter.
A concession term of 10 years is calculated from the commencement date and shall be renewed for another term of 10 years unless otherwise terminated before the expiry date. | Operational Phase
§ The project is to provide an offshore waste Reception Facility for the Eastern Zone Area of the maritime channel in Nigeria. |
95. | Concession Contract for the Implementation of Offshore Waste Reception Facility in the in the Western and Central Zones Areas
The Procurement and Deployment of Offshore Waste Collection System (PSV Type
Design, Financing, Construction, Procurement, and Development of an Onshore Waste Processing and Safe Recycling and Disposal Facility and System | The Nigerian Maritime Administration and Safety Agency (NIMASA) | African Circle Pollution Management Limited (ACPML) | Execution Date: May, 2023
A concession is for a fixed term of 10 years calculated from commencement date and the Concessionaire shall be given the right of first refusal for another term of 10 years unless otherwise terminated before the expiry date.
| Operational Phase
§ The project is to provide an offshore waste Reception Facility for the Western and Central Zones Areas of the maritime channel in Nigeria. |