ICRC superintends and regulates PPPs in Nigeria

Projects Under Custody (Post-Contract)


 
LIST OF PUBLIC PRIVATE PARTNERSHIP (PPP) AGREEMENTS/CONTRACTS UNDER THE COMMISSION’S CUSTODY AS OF JULY 2024
   

S/NInfrastructure SectorNumbers
1Ports Infrastructure Sector26
2Healthcare Infrastructure Sector2
3Public Building Infrastructure Sector2
4Inland Container Depot Infrastructure Sector6
5Telecommunications (Fibre Optic) Infrastructure Sector2
6Aviation Infrastructure Sector5
7Housing Development Infrastructure Sector4
8Defence/Paramilitary/Security Infrastructure Sector3
9Information Technology and Communication Infrastructure Sector9
10Electricity (Hydro & Solar) Infrastructure Sector5
11Agriculture Infrastructure Sector20
12Road/Highway Infrastructure Sector9
13Marine and Blue Economy (Offshore Waste Management)2
 

Total No of PPP Contracts

 

95
S/NPROJECT NAMEGOVT AGENCYCONCESSIONAIREDURATIONSTATUS
Ports Infrastructure Sector
LAGOS PORT COMPLEX
1

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)

 

Nigerian Ports Authority (NPA)Apapa Bulk Terminal Ltd “A”

25years

3rd April 2006 – 2nd April 2031

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

2

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)

 

Nigerian Ports Authority (NPA)Apapa Bulk Terminal Ltd “B”

25years

3rd April 2006 – 2nd April 2031

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

3

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)

 

Nigerian Ports Authority (NPA)ENL Consortium Ltd (Terminal C)

10 years (Initially)

2006 – 2016

 

* Extension of additional 5 years granted to expire in 2021

Under Review for Contract Renewal

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

 

 

 

 

 

 

4

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)

 

Nigerian Ports Authority (NPA)ENL Consortium Ltd (Terminal D)

10 years (Initially)

2006 – 2016

 

* Extension of additional 5 years granted to expire in 2021

Under Review for Contract Renewal

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

5

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)

 

Nigerian Ports Authority (NPA)Greenview Development Nigeria Ltd (Terminal E)

25 years

3rd April 2006 – 2nd April 2031

 

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

6

 

 

 

 

 

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Apapa)

Nigerian Ports Authority (NPA)

 

 

 

APMT Terminals Apapa Ltd

 

 

 

25 years

20th March 2006 -19th March 2031

 

 

 

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

 

 

 

 

 

 

 

 

TIN CAN PORT COMPLEX
7

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)

 

Nigerian Ports Authority (NPA)Five Star Logistics Ltd

15 years (Initially)

10th May 2006- 2nd May 2021

 

* Extension of additional 5yrs granted to expire 2nd May 2026

 

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

8Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)Nigerian Ports Authority (NPA)Ports and Terminal Multi-Service Ltd

25 years

18th August 2009 -17 August 2034

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

9

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)

 

Nigerian Ports Authority (NPA)Ports and Cargo Handlings Services Ltd

15 years (Initially)

10th May 2006 – 9th May 2021

 

 

* Extension of additional 5 years granted to expire in 2026

Under Review for Contract Renewal

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

10

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)

 

Nigerian Ports Authority (NPA)Tincan Island Container Terminal Ltd (TCIT)

15 years (Initially)

1st June 2006 – 31st May 2021

 

* Extension of additional 5 years granted to expire in 2026

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

 

11

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Tincan Island)

 

Nigerian Ports Authority (NPA)Josepdam Ports Services Nig Ltd

15 years (Initially)

11th May 2006 – 10th May 2021

 

 

*Extension of additional 5yrs granted to expire in 2026

Under Review for Contract Renewal

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

ONNE PORT COMPLEX
12

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)

 

Nigerian Ports Authority (NPA)Brawal Oil Services Ltd

25 years

6th August 2006 – 5th August 2031

Operational Phase

 

§  The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

13

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)

 

Nigerian Ports Authority (NPA)West African Container Terminal Ltd (WACT)

25 years

1st September, 2007 -31st August, 2032

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

14

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)

 

Nigerian Ports Authority (NPA)Intels Nigeria Ltd (Onne- FLT)

25 years

22nd June 2006 – 21st June 2031

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

 

15

 

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Onne)Nigerian Ports Authority (NPA)

Intels Nigeria Ltd (Onne – FOT)

 

25 years

22nd June 2006 – 21st June 2031

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

CALABAR PORT COMPLEX
16

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Calabar)

 

Nigerian Ports Authority (NPA)Intels Nigeria Ltd (Calabar)

25 years

21 June 2007 – 20th June 2032

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

17

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Calabar)

 

Nigerian Ports Authority (NPA)

Shoreline Logistics Nigeria Ltd

(Addax Logistics Nig Limited)

25 years

26th May 2007 – 25th May 2032

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

18

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Calabar)

 

Nigerian Ports Authority (NPA)Ecomarine (ECM) Terminals Ltd

Initially 25 years

1st August 2007 – 31st July 2032

 

* Extension of additional 5 years granted to expire in 2037

 

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

DELTA PORT COMPLEX
19

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)

 

Nigerian Ports Authority (NPA)Intels Nigeria Ltd (Terminal A -Warri)

25 years

21st June 2006 – 22nd June 2031

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

20

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)

 

Nigerian Ports Authority (NPA)Intels Nigeria Ltd (Terminal B -Warri)

25 years

21st June 2006 – 22nd June 2031

 

 

 

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

21

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)

 

Nigerian Ports Authority (NPA)Associated Maritime Services Ltd

Initially 15 years

11th June 2006 -10th June 2021

 

 

* Extension of additional 5 years granted to expire in 2026

Under Review for Contract Renewal

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

22

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Warri)

 

Nigerian Ports Authority (NPA)Julius Berger Services Nigeria Ltd

25 years

1st April 2007 – 31 March 2032

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

 

 

23Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal B Old Port (Warri)Nigerian Ports Authority (NPA)

Ocean & cargo Terminal Services

 

25 years

22nd February, 2019

21st February, 2044

 

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

 

RIVERS PORT COMPLEX
24

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Port Harcourt)

 

Nigerian Ports Authority (NPA)Port and Terminal Operators Nig Ltd

Initially 15 years

23rd June 2006 -22nd June 2021.

 

* Extension of additional 5 years granted to expire in 2026

 

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

25

Concession for the Development, Finance, Maintenance, Operate and Transfer of Port Terminal (Port Harcourt)

 

Nigerian Ports Authority (NPA)BUA Ports and Terminals Ltd

20 years

9th August 2006 – 8th August 2026

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

 

 

 

 

 

 

 

 

 

Lekki Deep-Water Port Complex

 

26Development and Operation of Deep-Water Port (Lekki, Lagos)Lekki Port LFTZ Enterprise LimitedThe Nigerian Ports Authority/Lagos State Government

45 years (April 21st 2011 – April 20th 2056)

 

Renewable for another 25 years with a 5-year notification period before the expiration of the contract.

Operational Phase

 

§ The Landlord model of Public Private Partnership was adopted to increase efficiency in port operations, decrease the cost of port services to stakeholders, decrease the cost to the Government and attract private sector investment.

Healthcare Infrastructure Sector

 

27

Concession for the Operation, Management and Provision of Primary, Secondary and Tertiary Health Care at the Garki Hospital Abuja

 

Federal Capital Territory Administration (FCTA)NISA Premier Hospital Ltd

15 years from

20th March 2007

To 19th March 2022

Contract Expired

(Undergoing Hand-back Process)  

 

§  The Garki Contract was executed to provide primary, secondary and tertiary health care in an efficient and commercially viable manner, in accordance with the terms and conditions of the agreement.

 

28

Concession for the operation and maintenance of two Warehouses located in Lagos Federal Central Medical Warehouse and Abuja Premier Medical Warehouse, through an Operate and Management contract

(Warehouse in a Box)

Federal Ministry of Health

MDS Logistics Limited

 

 

 

 

5 years

14th May 2019 – 13 May 2024

Operational Phase

 

§ The Operations and Management Contract was executed to provide turn-key medical warehousing services for sustainable Health commodities storage in the pharmaceutical based grade medical warehousing facilities.

 

 

 

Public Building Infrastructure Sector

 

29

Concession for the renovation of 18 Blocks Student Hostel of the Kaduna Polytechnic

 

Mark Point Project Limited

 

The Kaduna Polytechnic

 

The contract is for 14 years from the effective date.

 

21st August 2020 - 20th August 2034.

 

Implementation is stalled

 

§ The Contract is to provide affordable hostel accommodation facilities management for the students of Kaduna Polytechnic.

 

30

Concession Agreement for the Design, Finance, Build, Operate and Transfer of the National Hajj Commission of Nigeria Building Complex in Kano, kano State

 

 

 

 

National Hajj Commission of Nigeria (NAHCON)Did Al Amana Hajj House Market Kano Limited

The contract is for 35 years.

7th September, 2022 - 2057

 

Construction Phase

 

§ The Contract is for the construction and management of 608 modern lock-up stores on the Hajj Commission Land in Kano State.

Inland Container Depot Infrastructure Sector

 

31

 

Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Abia State)

 

Nigerian Shippers Council (NSC)Eastgate Inland Container Depot Ltd

30 years

2007 - 2037

Contract is under review by the Parties

 

The purpose of the Concession contract are as follows:

§  To provide an inland location for the trans-shipment of sea cargo to inland destinations.

§  Providing quick and safe access to port facilities from inland transport networks connected by road or rail.

§  To provide solutions to logistic issues the decongestion of goods at the main seaports by increasing storage facilities and terminals at the inland dry port.

 

 

 

 

32Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Oyo State)Nigerian Shippers Council (NSC)Catamaran Logistics Ltd

25 years

2007 -2032

Contract is under review by the Parties

 

The purpose of the Concession contract are as follows:

§  To provide an inland location for the trans-shipment of sea cargo to inland destinations.

§  Providing quick and safe access to port facilities from inland transport networks connected by road or rail.

§  To provide solutions to logistic issues the decongestion of goods at the main seaports by increasing storage facilities and terminals at the inland dry port.

 

33Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Plateau State)Nigerian Shippers Council (NSC)Duncan Maritime Ventures Nigeria Ltd

25 years

2007 - 2032

Contract is under review by the Parties

 

The purpose of the Concession contract are as follows:

§  To provide an inland location for the trans-shipment of sea cargo to inland destinations.

§  Providing quick and safe access to port facilities from inland transport networks connected by road or rail.

§  To provide solutions to logistic issues and the decongestion of goods at the main seaports by increasing storage facilities and terminals at the inland dry port.

 

 

 

 

 

 

 

 

34Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Kano State)Nigerian Shippers Council (NSC)Dala Inland Dry Port Nigeria Ltd

25 years

2007 - 2032

Contract is under review by the Parties

 

The purpose of the Concession contract are as follows:

§  To provide an inland location for the trans-shipment of sea cargo to inland destinations.

§  Providing quick and safe access to port facilities from inland transport networks connected by road or rail.

§  To provide solutions to logistic issues the decongestion of goods at the main seaports by increasing storage facilities and terminals at the inland dry port.

 

35Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Katsina State)Nigerian Shippers Council (NSC)Equatorial Marine Oil and Gas Company Ltd

25 years

2007 - 2032

Contract is under review by the Parties

 

The purpose of the Concession contract are as follows:

§  To provide an inland location for the trans-shipment of sea cargo to inland destinations.

§  Providing quick and safe access to port facilities from inland transport networks connected by road or rail.

§  To provide solutions to logistic issues the decongestion of goods at the main seaports by increasing storage facilities and terminals at the inland dry port.

 

 

 

 

 

 

 

36Concession for Build, Own, and Operate a Container Freight Station of Inland Container Depot (Borno State)Nigerian Shippers Council (NSC)Migfo Nigeria Limited

25 years

2007 - 2032

Contract is under review by the Parties

 

The purpose of the Concession contract are as follows:

§  To provide an inland location for the trans-shipment of sea cargo to inland destinations.

§  Providing quick and safe access to port facilities from inland transport networks connected by road or rail.

§  To provide solutions to logistic issues the decongestion of goods at the main seaports by increasing storage facilities and terminals at the inland dry port.

Telecommunications (Fibre Optic) Infrastructure Sector

 

37

Concession Agreement for the Design, Build, Finance, Operate TCN’s Fibre Optic Cable Telecommunications Infrastructure for the Western part of Nigeria

 

Transmission Company of NigeriaPhase 3 Telecom Ltd

15 Years

March 2006 -2021.

Parties have mutually extended the contract for twenty (20) years to expire on 30th November 2040

Operational Phase

 

§  The project is to develop, upgrade and commercialise the existing TCN’s fibre optic network and facilities to provide a cost-effective telecommunication infrastructure for more efficient attainment of its corporate goals.

38

Concession Agreement for the Design, Build, Finance, Operate TCN’s Fibre Optic Cable Telecommunications Infrastructure for the Eastern part of Nigeria

 

Transmission Company of NigeriaAlheri Engineering Services L td

15 Years

March 2006 -2021

Parties have mutually extended the contract for twenty (20) years to expire on 30th November 2040

Operational Phase

 

§  The contract is to develop, upgrade and commercialise the existing TCN’s fibre optic network and facilities to provide a cost-effective telecommunication infrastructure for more efficient attainment of its corporate goals.

Aviation Infrastructure Sector
39

Concession to Design, Develop, Finance, Construct, Complete, Test, Commission, Operate, Manage, Maintain and Transfer the Muritala Muhammed Airport II, Ikeja – Lagos Domestic Terminal (Lagos)

 

The Federal Airports Authority of Nigeria (FAAN)Bi -Courtney Ltd

Initially 12 Years

April 24th 2003 – April 23rd 2015
*Extension of 36 years was granted through an Addendum to the Concession Agreement signed by Parties on 2nd February 2007

Operational Phase

 

The project is for the construction and management of an airport terminal that receives domestic flights and provides passenger service operations at the Muritala Muhammed Airport Ikeja - Lagos

 

40

 

 

 

 

 

 

Concession for the Construction and Development of a Four-Star Hotel at the Muritala Muhammed Airport Ikeja – LagosFederal Ministry of Transportation /Federal Airports Authority of NigeriaBi -Courtney Ltd

40 Years

September 27th 2005

to September 26th 2045

 

Construction stalled 

 

§  The project is for the development of a world-class Four Star Hotel at the Muritala Muhammed Airport Ikeja - Lagos.

41Concession for the Construction and Development of a Conference Centre at the Muritala Muhammed Airport Ikeja - LagosFederal Airports Authority of NigeriaBi -Courtney Ltd

40 Years

21st November 2006 – 20th November 2046

Construction stalled 

 

§  The project is for the development of a world-class Conference Centre at the Muritala Muhammed Airport Ikeja -Lagos.

 

42

Multi-level Car Park Facility at Murtala Muhammed International Airport, Lagos

 

The Development of a Multi-level Car Park Facility at Murtala Muhammed International Airport, Lagos

Federal Aviation Authority of Nigeria (FAAN)

 

Seymour Aviation Ltd

 

40 years

7th August 2013 -
6th August 2053

 

Operational Phase

 

The project is for the development of an affordable and decent multi-level car parking lots at the Murtala Muhammed International Airport, Lagos.

 

 

43

Concession for the Maintenance, Repair and Overhaul (MRO) Facility at the MMA, Lagos. The Contract is a Build Operate, Maintain and Transfer model.

 

The Federal Ministry of Aviation/Federal Airports Authority of Nigeria (FAAN)Continental Aircraft Repairs and Maintenance Services Limited

30 years

Inclusive of 4 years Construction period

 

(10th August, 2023 – 2053)

 

Construction Phase 

 

§ The project is aimed at promoting investment and private sector participation in the establishment of a Maintenance, Repair and Overhauling Centre in Nigeria for aircraft.

 

 

Housing Development Infrastructure Sector

 

44

Concession Agreement for the Reclamation and Infrastructural Development of FESTAC Phase II Housing Development Project –FESTAC Town, Lagos

 

Federal Ministry of Lands, Housing and Urban Development/The Federal Housing Authority (FHA)New FESTAC Property Development Company Ltd

30 years

8th September 2014 -7th September 2044

Construction Phase

(Contractual Dispute)  

 

§ The project involves reclamation works, Infrastructure works which will provide land for commercial and residential real estate area in Lagos State.

45

Concession contract for the development of the 6.041 hectares of land at Adekunle Fajuyi Way, GRA Lagos into a world-class hotel. The land had hitherto been underutilized

 

The Federal Radio Corporation of Nigeria (FRCN)

Fish Valley Investment and Property Ltd

 

55 years

(2023-2078)

 

Construction Phase

 

§ The project is to development of the FRCN land in Lagos into a real estate properties.

46

Concession for the redevelopment of the 38,500 sqm Deputy Inspector General of Police (DIG) Quarters, Maitama, Abuja.

 

The Nigerian Police Force

Cosgrove Investment Ltd

 

60 years

2022 – 2082 with 5 years construction period

 

 

Construction Phase

 

§ The project is aimed at the redevelopment and complete replacement of the existing dilapidated physical structures at the DIG’s Quarters in Maitama, Abuja with brand new 39-unit Ultra-Modern Super-Luxury real estate with 39 units of five Bedroom Fully Detached Duplexes.

47Concession contract for the Redevelopment of the Nigerian Police Senior  Officers Quarters Ikeja, Lagos through Public Private Partnership Arrangement.The Nigerian Police ForceBlacl Qoral Concepts Limited

47 years

Execution Date: 9th June, 2023

 

 

 

Construction/Renovation Phase

§ The project is for the renovation and modernisation of the Senior Police Quarters in Lagos for use by personnel of the Nigerian police force.

 

Defence Infrastructure Sector

 

48

Public Private Partnership and Joint Venture Agreement for the Establishment of a Military Clothing Factory

Kaduna, Kaduna State

Defence Industries Corporation of      Nigeria (DICON)

 

SUR Corporate Wear Tasarim Dani Manlik GYM SAN VE TIC AS (SUR) Turkey

50 years

24th October 2019 -
23 October 2069

Construction Phase

 

§ The project is aimed at the construction and equipment of a modern Military Clothing factory and the production of affordable uniforms for security agencies in Nigeria.

 

49Concession contract for the Design, Finance, Upgrade, Operate and transfer of the Nigerian Correctional Service Shoe and garment Factories at Aba in Abia State and the Leather (Tannery) Factory at Janguza, Kano State, under a Public Private partnership arrangement.Nigerian Correctional Service (NCoS)Erojim Investment Limited

20 years

13th January 2021-

12th January 2041

Operational Phase

 

§ The project is for the construction and rehabilitation of Nigerian Correctional Service Shoe and garment factories in Aba and Kano.

 

50Concession contract of the integrated digital trunking communications system designed to provide robust, reliable, secured and independent multimedia communication systems (voice, video and data) for the Nigerian Police Force and other security agencies of Government.Federal Ministry of Police AffairsMessrs. MPS Technologies Ltd

30 years, with the first 36 months designated for rehabilitation work (2021 – 2051).

 

The contract was signed on the 27th January 2021

Operational Phase

 

§ The project is aimed at providing an integrated digital trunking communications system for a robust, reliable, secured and independent multimedia communication (voice, video and data) in Nigeria.

Information Technology and Communication Infrastructure Sector

 

51

Concession for the Production of ECOWAS Biometric Identity Cards

 

Federal Ministry of InteriorEuphoria Press Limited

10 years

16th April 2019 –

15 April 2029

Operational Phase

 

§ The project is aimed at providing a safe and secure ICT platform for the automation of the Nigerian Immigration Services.

52Concession contract for the Design, Development, and Management of a Secured Ticketing solution for the NRC Rail Services for the Five (5) stations along the NRC rail Corridor between Abuja and Kaduna.Nigerian Railway Corporation (NRC)SecureID Limited

10 years

18th November 2020 - 17th November 2030, subject to any future amendment to the contract term

 

Operational Phase

 

§ The project is aimed at providing a safe and secure e-ticketing platform for train passenger services on the Abuja-Kaduna rail transport system.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

53Concession Agreement for the Process Automation of Citizenship and Business Department (Ecitibiz) using Public-Private PartnershipFederal Ministry of Interior (the Grantor)Anchor Dataware Solutions Limited

The contract was executed on the 24th of April, 2012 for a contract term of 5 years (2012 – 2017).

 

Renewed for another 5 years (2017 to 2022)

 

Renewed for another 3 years (2022 to 2025)

 

Operational Phase

 

§ The project aimed at providing a safe and secure ICT platform to render  automated services for marriage registration, expatriate quota registration, naturalization registration and place of worship.

54Concession contract for the Deployment of a Revenue Assurance Solution Platform in the Nigerian Telecommunications IndustryNigeria Communication Commission (NCC)3R Revenue Assurance Solutions Limited (3RRAS)

15 years

17th June 2022

-

16th June 2037

Operational Phase

 

§ The project is to provide a safe and secured ICT platform to harness revenue payable to the Government by telecommunication services providers and to improve telecom services nationwide.

 

 

55

Concession contract for the Implementation of the End-To-End Technology Platform for Automation of Nigeria Customs Service’s Business Processes and Upgrading of ITS Infrastructure

 

(Presidential Initiatives on Customs Modernization “E-Customs Project”)

 

The Nigeria Customs Service Board (For and On Behalf of the Federal Government of Nigeria)E-Customs HC Project Limited

20 years

28th September 2022 -

27th September 2042

 

 

 

 

Operational Phase

 

§ The project is aimed at providing a safe and secure ICT platform for the processing and payment of customs duties to the Government and the modernization of the NCS operations.

 

 

 

 

 

 

56

Concession contract for Nigeria e-Immigration Solution as part of the Nigerian e-Government Initiative

 

 

Federal Ministry of Interior and National e-Government Strategies Limited

 

 

New-works Solutions and Investment Ltd

Principal Contract signed on 12th December 2007 for a duration of 6 years

 

This was renewed on 7th March 2013 and commenced on 12th December 2013

 

This was further renewed in 2019 to expire in 2025

 

 

Operational Phase

 

§  The project is to provide Biometric visa and visa sorting application centre as part of the Nigerian e-Government Initiative.

 

57Concession Agreement in respect of the Police Specialised Services Automation Project (POSSAP)The Federal Ministry of Police AffairsMessrs Possap Solutions Limited

The contract was executed on 19th November 2021 for a duration of 10 years (2021 – 2031)

 

 

Launched on 2nd June 2022 marking the Commencement of the project implementation.

 

Operational Phase

 

§ The project aimed at providing a safe and secured ICT automated platform to render services of police escorts and guards, firearm licenses, Police extract, Police Character certificates, by the Nigerian Police Force and efficiently manage the revenue streams.

58

Concession contract for the Installation, Operation and Maintenance of On-Street Parking Meters for Maitama and Garki Area 1 areas.

 

Federal Capital Territory Administration (FCTA)Automaten Technik Aaumann Nigeria Limited (ATB)

Contract duration: 10 years

 

4th August 2023 –

3rd August 2033

 

 

 

 

 

 

Operational Phase

 

§  The project is aimed at managing upgraded on-street parking services at a fee and maintaining other ancillary activities as provided in the contract.

59

Concession contract for the Installation, Operation and Maintenance of On-Street Parking Meters for Wuse II and Utako areas

 

Federal Capital Territory Administration (FCTA)NAJEC Limited

Contract duration: 10 years

 

4th August 2023 –

3rd August 2033

 

Operational Phase

 

§ The project is aimed at managing upgraded on-street parking services at a fee and maintaining other ancillary activities as provided in the contract.

Electricity Infrastructure Sector

 

60

Concession Agreements for the Operation, Maintenance, Design and Sales of electricity produce – Niger State

 

 

Kainji Hydro Electricity PlcMainstream Energy Solutions Ltd

30 Years

21st February 2013 –

20th February 2043

Operational Phase

 

§ The project is for the restoration of the generation capacity of the Kainji/Jebba Hydro Damn and to enhance the electricity supply from the national grid.

 

61Concession Agreements for the Operation, Maintenance, Design and Sales of electricity produce – Niger StateShiroro Hydro Electric PlcNorth South Power Company Ltd

30 Years

21st February 2013 –

20th February 2043

Operational Phase

 

§  The project is for the restoration of the generation capacity of the Shiroro Hydro Damn and to enhance the electricity supply from the national grid.

 

62Concession for the Design, Construction, Install, Operation and Maintain the Dadin Kowa Hyro Dam for Electricity Generation with a capacity of 39 MW – Gombe StateFederal Ministry of Water ResourcesMabon Limited

25 years from 4th July, 2005 (2005 – 2030)

 

Addendum to the agreement signed on 4th August 2016

 

 

Operational Phase

 

§  The project is for the restoration of the generation capacity of the Shiroro Hydro Damn and to enhance the electricity supply from the national grid.

 

 

 

 

 

 

 

63Concession of Gurara Hydro Power Project Kaduna Operate and Maintain PPP project (30 Mega Watts)Federal Ministry of Water Resources

North South Power Company Limited

 

 

25 years from the commencement date

 

Contract Signed; 12th May, 2020 (2020 – 2045).

 

Rehabilitation Phase

 

§  The project is for the restoration of the generation capacity of the Gurara Phase I Hydro Damn and to enhance the electricity supply from the national grid.

 

64

Concession for the Service Management of Gurara Phase 1 Multipurpose Dam Facilities

 

 

Federal Ministry of Water Resources

Messrs Gams and Abell Ltd, in Conjunction with Ryzyn Global Inc. USA

 

 

10 years

30th December 2019 – 29th December 2029

 

Operational Phase

 

§ The project is for the Operation and Management contract of the Gurara Phase I Hydro Dam infrastructure/facilities and other connected services including irrigation services, water supply, agriculture, etc.

 

Agriculture (Silos- Storage) Infrastructure Sector

 

65Concession of Grain Storage Facilities for food storage (Silos) in Ado EkitiFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

 

10 Years

2018 - 2028

Not Operational

 

The Silo project is to carry out the following:

i.    Take delivery of grain products for stage

ii.    Clean, dry, convey, grade, process and handle the grain products

iii.    Ship out the grain products to the processing centres.

 

 

 

 

 

 

 

66Concession of Grain Storage Facilities for food storage (Silos) in AkureFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

 

10 Years

2018 - 2028

Not Operational

 

The Silo project is to carry out the following:

i.    Take delivery of grain products for stage

ii.    Clean, dry, convey, grade, process and handle the grain products

iii.    Ship out the grain products to the processing centres.

 

67Concession of Grain Storage Facilities for food storage (Silos) in GayaFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

 

10 Years

2018 - 2028

Not Operational

 

The Silo project is to carry out the following:

i.    Take delivery of grain products for stage

ii.    Clean, dry, convey, grade, process and handle the grain products

iii.    Ship out the grain products to the processing centres.

 

68Concession of Grain Storage Facilities for food storage (Silos) in IkenneFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

 

10 Years

2018 - 2028

Operational Phase

 

The Silo project is to carry out the following:

i.    Take delivery of grain products for stage

ii.    Clean, dry, convey, grade, process and handle the grain products

iii.    Ship out the grain products to the processing centres.

 

 

 

 

69Concession of Grain Storage Facilities for food storage (Silos) in JosFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

 

10 Years

2018 - 2028

Not Operational

 

The Silo project is to carry out the following:

i.    Take delivery of grain products for stage

ii.    Clean, dry, convey, grade, process and handle the grain products

iii.    Ship out the grain products to the processing centres.

 

70Concession of Grain Storage Facilities for food storage (Silos) in OgojaFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

 

10 Years

2018 - 2028

Not Operational

 

The Silo project is to carry out the following:

i.    Take delivery of grain products for stage

ii.    Clean, dry, convey, grade, process and handle the grain products

iii.    Ship out the grain products to the processing centres.

 

71Concession of Grain Storage Facilities for food storage (Silos) in SokotoFederal Ministry of Agriculture and Rural DevelopmentAgro-Universal
Consortium

 

10 Years

2018 - 2028

Not Operational

 

The Silo Silo project is project is to carry out the following:

i.    Take delivery of grain products for stage

ii.    Clean, dry, convey, grade, process and handle the grain products

iii.    Ship out the grain products to the processing centres.

 

 

 

 

72Concession of Grain Storage Facilities for food storage (Silos) in IgbariamFederal Ministry of Agriculture and Rural Development

Coscharis Farms Limited

 

 

 

10 Years

2018 - 2028

Operational Phase

 

The Silo project is to carry out the following:

i.    Take delivery of grain products for stage

ii.    Clean, dry, convey, grade, process and handle the grain products

iii.    Ship out the grain products to the processing centres.

 

73Concession of Grain Storage Facilities for food storage (Silos) in EzilloFederal Ministry of Agriculture and Rural Development

Ebony Agro Industries Ltd

 

 

10 Years

2018 - 2028

Not Operational

 

The Silo project is to carry out the following:

i.        Take delivery of grain products for stage

ii.        Clean, dry, convey, grade, process and handle the grain products

iii.        Ship out the grain products to the processing centres.

 

74Concession of Grain Storage Facilities for food storage (Silos) in IbadanFederal Ministry of Agriculture and Rural Development

Independent Ltd

 

10 Years

2018 - 2028

Operational Phase

 

The Silo project is to carry out the following:

i.        Take delivery of grain products for stage

ii.        Clean, dry, convey, grade, process and handle the grain products

iii.        Ship out the grain products to the processing centres.

 

 

 

 

75Concession of Grain Storage Facilities for food storage (Silos) in BulasaFederal Ministry of Agriculture and Rural Development

Matrixville Consortium Ltd

 

 

10 Years

2018 - 2028

Operational Phase

 

The Silo project is to carry out the following:

i.    Take delivery of grain products for stage

ii.    Clean, dry, convey, grade, process and handle the grain products

iii.    Ship out the grain products to the processing centres.

 

76Concession of Grain Storage Facilities for food storage (Silos) in JahunFederal Ministry of Agriculture and Rural Development

Matrixville Consortium Ltd

 

 

10 Years

2018 - 2028

Not Operational

 

The Silo project is to carry out the following:

i.        Take delivery of grain products for stage

ii.        Clean, dry, convey, grade, process and handle the grain products

iii.        Ship out the grain products to the processing centres.

 

77Concession of Grain Storage Facilities for food storage (Silos) in KadunaFederal Ministry of Agriculture and Rural Development

Matrixville Consortium Ltd

 

 

10 Years

2018 - 2028

Not Operational

 

The Silo project is to carry out the following:

i.        Take delivery of grain products for stage

ii.        Clean, dry, convey, grade, process and handle the grain products

iii.        Ship out the grain products to the processing centres.

 

 

 

 

78Concession of Grain Storage Facilities for food storage (Silos) in Kwali,Federal Ministry of Agriculture and Rural Development

Matrixville Consortium Ltd

 

 

10 Years

2018 - 2028

Operational Phase

 

The Silo project is to carry out the following:

i.    Take delivery of grain products for stage

ii.    Clean, dry, convey, grade, process and handle the grain products

iii.    Ship out the grain products to the processing centres.

 

79Concession of Grain Storage Facilities for food storage (Silos) in Lafiagi,Federal Ministry of Agriculture and Rural Development

Matrixville Consortium Ltd

 

10 Years

2018 - 2028

Not Operational

 

The Silo project is to carry out the following:

i.    Take delivery of grain products for stage

ii.    Clean, dry, convey, grade, process and handle the grain products

iii.    Ship out the grain products to the processing centres.

 

80Concession of Grain Storage Facilities for food storage (Silos) in GombeFederal Ministry of Agriculture and Rural DevelopmentServewell Agricultural Services Limited

10 Years

2018 - 2028

Operational Phase

 

The Silo project is to carry out the following:

i.    Take delivery of grain products for stage

ii.    Clean, dry, convey, grade, process and handle the grain products

iii.    Ship out the grain products to the processing centres.

 

 

 

 

81Concession of Grain Storage Facilities for food storage (Silos) in MakurdiFederal Ministry of Agriculture and Rural Development

Upland Grains Ltd

 

10 Years

2018 - 2028

Operational Phase

Silo project is to carry out the following:

i.        Take delivery of grain products for stage

ii.        Clean, dry, convey, grade, process and handle the grain products

iii.        Ship out the grain products to the processing centres.

 

82Concession contract for the Redevelopment of the Ogun-Osun River Basin Development Authority Complex (K’Maroun), Ijora Lagos.Ogun Osun River Basin Development AuthorityMessrs. Asiko GT Property Company Limited

20 years

13th October 2022 -

12th October 2042

 

Construction Phase

 

The project is to rehabilitate existing office structures and construction of modern facilities for business and commercial purposes.

83

Lease Agreement between the Federal Ministry of Agriculture and Rural Development and Alfin Fisheries Limited for the Finance, rehabilitation, and Operation of the Federal Coastal Fishery Terminal, Ebughu, Akwa Ibom State

 

Federal Ministry of Agriculture and Rural DevelopmentAlfin Fisheries Limited

11 years (inclusive of 1 year moratorium period)- 2023 - 2034

Effective Date: 5th May 2023

Rehabilitation Phase

 

§ The project is to rehabilitation and modernisation of the coastal terminal as a major fishing hub in Nigeria.

 

 

84Concession contract of the Federal Government of Nigeria, on the Cassava/Bio-Mass Bioethanol Value Chain Project in the Six (6) Geo-Political Zones in Nigeria.The Federal Government of Nigeria, represented by the Federal Ministry of Finance, Budget and National Planning (FMFBNP)Biosources and Technologies Limited

5 years

 

22nd May, 2023 -21st May, 2028

 

 

Addendum to the agreement signed on 23rd May 2023

 

Operational Phase

 

§  The project is aimed at establishing the Cassava Bioethanol Value Chain in the Six (6) geo-political zones in Nigeria.

 

 

 

 

 

 

Road Infrastructure Projects (HDMI) – Transport Sector
85

Highway Development & Management Initiative (HDMI) Concession Contract for Route 1, Benin – Asaba 125Km

 

 

Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria

 

Concessionaire: Africa Plus Partner Nigeria Limited Consortium

 

SPV: Benin-Asaba Expressway Concession Company Ltd`

25 years

 

May, 2023 - May, 2048

 

 

 

Contract Renegotiation Phase

 

§  The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximising the use of Federal roads along the right of way and developing other highway furniture.

 

86

Highway Development & Management Initiative (HDMI) Concession Contract for Route 2 – (Abuja – Lokoja), 93Km

 

 

 

Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria

 

Concessionaire:

Avia Infrastructure Services Ltd Consortium

 

SPV: Highstream Road Networks Limited

25 years

 

May, 2023 - May, 2048

 

 

Contract Renegotiation Phase

 

§ The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximising the use of Federal roads along the right of way and developing other highway furniture.

 

87

Highway Development & Management Initiative (HDMI) Concession Contract for Route 4, Onitsha – Owerri – Aba, 161Km

 

 

Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria

 

Concessionaire:

Enyimba Economic City Development Company Consortium

 

SPV: EECD INFRA Consortium Limited

Duration: 25 years

 

 

May, 2023 - May, 2048

 

Contract Renegotiation Phase

 

§ The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximising the use of Federal roads along the right of way and developing other highway furniture.

 

 

 

 

 

 

88

Highway Development & Management Initiative (HDMI) Concession Contract for Route 5, Shagamu – Benin - 258Km

 

 

 

Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria

 

Concessionaire:

Africa Finance Corporation Consortium

 

SPV:

Olumo-Bronze Corridor Concession Company

25 years

 

May, 2023 - May, 2048

 

Contract Renegotiation Phase

 

§ The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximising the use of Federal roads along the right of way and developing other highway furniture.

89

Highway Development & Management Initiative (HDMI) Concession Contract for Route 5 Expansion of 5.4Km of Abuja – Keffi Expressway and Dualisation of Keffi – Akwanga – Lafia – Makurdi Road, 227.2Km

 

 

Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria

 

Concessionaire:

China Harbour Engineering Company Nigeria Ltd

 

SPV:

China Harbour Nigeria Operation and Maintenance Company Ltd

25 years

 

May 2023 -May 2048

Contract Renegotiation Phase

 

§ The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximise the use of Federal roads along the right of way and developing other highway furniture.

 

90

Highway Development & Management Initiative (HDMI) Concession Contract for Route 7A Kano – Maiduguri (Kano _Shuari) 100Km

 

 

Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria

 

Concessionaire:

Dafac Consortium Limited

 

SPV:

Messrs Dafac Consortium Limited

25 years

 

May, 2023 - May, 2048

Contract Renegotiation Phase

 

§ The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximising the use of Federal roads along the right of way and developing other highway furniture.

 

 

 

 

 

 

 

91

Highway Development & Management Initiative (HDMI) Concession Contract for Route 9 – Enugu Portharcourt, 200Km

 

 

Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria

 

Concessionaire:

Enyimba Economic City Development Company Consortium

 

SPV: EECD INFRA Consortium Limited

25 years

 

May, 2023 - May, 2048

Contract Renegotiation Phase

 

§ The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximising the use of Federal roads along the right of way and developing other highway furniture.

 

92

Highway Development & Management Initiative (HDMI) Concession Contract for Route 11, Lagos – Otta – Abeokuta, 80Km

 

 

Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria

 

Concessionaire:

Africa Plus Partners Nigeria Limited Consortium

 

SPV:

Lagos -Abeokuta Highway Concession

25 years

 

May, 2023 - May, 2048

Contract Renegotiation Phase

 

§ The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximising the use of Federal roads along the right of way and developing other highway furniture.

 

93

Highway Development & Management Initiative (HDMI) Concession Contract for Route 12, Lagos – Badabry – Seme Border, 79Km

 

 

Federal Ministry of Works and Housing for and on behalf of the Federal Government of Nigeria

 

Concessionaire:

Africa Finance Corporation Consortium

 

SPV:

Eko-Freedom Road Concession Company

25 years

 

May, 2023 - May, 2048

Contract Renegotiation Phase

 

§ The HDMI project is aimed at attracting expertise and sustainable investment/funding in the development of road infrastructure and maximising the use of Federal roads along the right of way and developing other highway furniture.

 

 

 

 

 

 

 

Marine and Blue Economy Sector (Offshore Waste Management)

 

94.

Concession Contract for the Implementation of Offshore Waste Reception Facility at the Eastern Zone Areas

 

The Procurement and Deployment of Offshore Waste Collection System (PSV Type

 

Design, Financing, Construction, Procurement, and Development of an Onshore Waste Processing and Safe Recycling and Disposal Facility and System

The Nigerian Maritime Administration and Safety Agency (NIMASA)XPO Marine Services Ltd

Execution Date: May, 2023

 

An Initial Implementation/Construction period from the Effective date and ending 5 years thereafter.

 

A concession term of 10 years is calculated from the commencement date and shall be renewed for another term of 10 years unless otherwise terminated before the expiry date.

Operational Phase

 

§  The project is to provide an offshore waste Reception Facility for the Eastern Zone Area of the maritime channel in Nigeria.

95.

Concession Contract for the Implementation of Offshore Waste Reception Facility in the in the Western and Central Zones Areas

 

 

The Procurement and Deployment of Offshore Waste Collection System (PSV Type

 

 

Design, Financing, Construction, Procurement, and Development of an Onshore Waste Processing and Safe Recycling and Disposal Facility and System

The Nigerian Maritime Administration and Safety Agency (NIMASA)African Circle Pollution Management Limited (ACPML)

Execution Date: May, 2023

 

A concession is for a fixed term of 10 years calculated from commencement date and the Concessionaire shall be given the right of first refusal for another term of 10 years unless otherwise terminated before the expiry date.

 

 

Operational Phase

 

§  The project is to provide an offshore waste Reception Facility for the Western and Central Zones Areas of the maritime channel in Nigeria.