PPP PROJECT PIPELINE 2016 / 2017
INFRASTRUCTURE CONCESSION REGULATORY COMMISSION  2016/2017 PUBLIC PRIVATE PARTNERSHIP PROJECTS OPPORTUNITIES Section 2(4) of the ICRC (Establishment etc) Act 2005 requires the Commission to publish all Federal government projects eligible for Public Private Partnership (PPP) contracts. This publication is meant to notify interested investors to prepare to participate in the process when procurement commences. THIS IS NOT AN INVITATION TO SUBMIT EXPRESSION OF INTEREST. The projects are consistent with the change agenda of His Excellency, President Muhammadu Buhari, GCFR and are being developed by relevant Ministries, Departments and Agencies (MDAs) of the Federal Government in line with the ICRC Act 2005 and the National Policy on PPP.
SN PROJECTS & DESCRIPTION MDA SECTOR PHASE ESTIMATED COST OF PROJECT
1 Lagos to Ibadan Expressway. Reconstruction, Rehabilitation and Expansion work is in progress through Traditional Procurement. (Contract to be funded by the Federal Government). The Infrastructure Bank Plc is assisting the Federal Government in raising funding to cover the Engineering Procurement Construction (EPC) funding gap. Federal Ministry of Power, Works & Housing (FMPWH) Roads Procurement Phase: The Commission issued a Full Business Case (FBC) Compliance Certificate for the Financing Arrangement 167,000,000,000 Naira
2 PPP development of dual carriage way from outer northern express way (Murtala Mohammed Way, Abuja) to ease congestion on Nyanya Road and surrounding axis. Federal Capital Development Authority (FCDA) Roads Development Phase:  The Ministry is to procure a TA to prepare an Outline Business Case (OBC) as to determine the project viability Not Available
3
  • PPPs for improved service delivery at the following:
  • Ilorin-Jebba-Mokwa-Tegina-Kaduna Road
  • Improvement of Apakun-Murtala Muhammed International Airport (MMA) Road Route NO. F269
  • Phase I: 2nd Lagos Outer Ring Road, Tin Can Island-Igando-Lagos/Otta Road Interchange-Lagos/Ibadan Expressway
  • Phase II: 2nd Lagos Outer Ring Road, Lekki-Ikorodu Shagamu/Benin Expressway
  • Abuja-Kaduna-Kano Dual Carriageway
  • Shagamu-Benin-Asaba Dual Carriageway
  • Onitsha-Enugu Dual Carriageway
Federal  Ministry of Power, Works & Housing (FMPWH) Roads Development Phase:                 MDA to engage TA to prepare OBC Not Available
4 PPPs for improved service delivery at the following:
  • Enugu-PortHarcourt Road
  • Lagos-Iseyin-Kishi-Kaiama Road
  • Kaiama-Bahama-Kaoje-Gwambu-Fakku-Sokoto Road
  • Construaction of a bridge over River Katsina Ala at Buruku, Benue State
  • Funtua-Zaria Road (A126)
  • Guto Bagana Bridge over River Benue
  • Calabar-Odukpani- Itu- Ikot Ekpene Road
Federal  Ministry of Power, Works & Housing (FMPWH) Roads & Bridges Development Phase:                 MDA to engage TA to prepare OBC Not Available
5 Development of hydroelectric power from existing 10 small & medium dams across the country to generate about 45MW of off-grid power for the dam environments. These include Owena, Ikere Gorge and Oyan dams in Lot 1; Bakalori, Doma and Omi-Kampe dams in Lot 2; Challawa, Tiga, Jibiya and Zobe dams in Lot 3. Federal  Ministry of Power, Works & Housing (FMPWH) Power Procurement Phase: The Federal Executive Council approved the  OBC of 6 projects on November 9, 2011. These include Ikere Gorge, Bakalori, Doma, Omi-Kampe, Jibiya and Zobe. These projects have now moved to Procurement Phase where the Private Sector Project Proponent will be procured. 29,356,876,605.23 Naira
6 Operations and Maintenance of 30MW hydroelectric power from Gurara 1 multi-purpose dam, Kaduna State. The construction has been completed, while the evacuation facilities are almost completed. Federal Ministry of Water Resources Power Development Phase: The Commission has issued OBC Compliance Certificate for FEC approval to be sought 6,679,288,975 Naira
7 Concession of the Gurara 2 Greenfield multi-purpose Dam, Niger State. This includes 300MW of hydropower components of the dam. Federal Ministry of Water Resources Power, Agriculture Development Phase:                 MDA to engage TA to prepare OBC Not Available
8 Development of Tede Dam for Hydro power and other purposes. Federal Ministry of Water Resources Power, Agriculture Development Phase:                 (Same as above) Not Available
9 Concession of Oturkpo Dam for Hydro Power and other purposes. Federal Ministry of Water Resources Power, Agriculture Development Phase:                     (Same as above) Not Available
10 Development of Dasin Hausa Dam for Hydro power and other purposes. Federal Ministry of Water Resources Power, Agriculture Development Phase:                     (Same as above) Not Available
11 Owena Multi-purpose Dam water supply. Federal Ministry of Water Resources Water Supply/ Agriculture Development Phase:                     (Same as above) Not Available
12 Concession and leasing of grain storage facilities (33 silos across the country), to optimally operate and maintain the silos for an agreed period of time Federal Ministry of Agriculture and Rural Development Agriculture Development Phase:            Technical review of OBC and Stakeholders Consultation completed 3,430,000,000 Naira
13 Concession of:
  • Federal Coastal Fishery Terminal, Ebughu, Akwa Ibom State
  • Fish Processing Centre, Jebba, Kwara State
  • Agro Aviation Hangar, Kaduna
Federal Ministry of Agriculture and Rural Development Agriculture Development Phase: MDA to engage TA to prepare OBC Not Available
14 Operations and Maintenance of about 1000Ha irrigation infrastructure for commercial agriculture at Gurara 1 Dam, Azare-Jere, Kaduna State to lease the irrigation facilities built by the Federal Government to private investors for optimal use. Federal Ministry of Water Resources Agriculture Development Phase: OBC Certificate of Compliance issued. N2,183,200,000.00
15 Ibom Deep Seaport Project:  An integrated, multi-purpose deep seaport which is being developed jointly by the FGN, Akwa Ibom State Government and subsequently,  private investors. It is planned to be the deepest port in the West African sub-region. Federal Ministry of Transportation/ Akwa  Ibom State Government Ports Procurement Phase: to identify and engage a competent private sector project proponent 1,760,354,039 Dollars                        (836,168,168,525 Naira)                    (This cost is being reviewed by the Ministry) 
16 Kirikiri Port Lighter Terminal I & II: This proposes to procure a concessionaire to rehabilitate and upgrade the existing ports facility. The project development and procurement costs are being sponsored by the World Bank. Federal Ministry of Transportation (FMoT) / Nigeria Ports Authority (NPA)  Ports Development Phase: OBC Compliance Certificate issued, for FEC approval to be sought 58,719,000,000 Naira
17 Operate and manage four river ports in the Lower Niger namely Onitsha, Lokoja, Baro and Oguta River Ports.   Onitsha River Port has been selected as the pilot case. PPP project development and procurement of the Inland Port. Concession is being sponsored by the World Bank. Federal Ministry of Transportation (FMoT)/ National Inland Waterways Authority (NIWA) Ports Development Phase: The Commission has issued OBC Certificate for FEC approval to be sought 595,020,000 Naira
18 Port Single Window: Introduction of electronic single window platform that can effectively coordinate all port related/cargo clearance activities capable of potentially transforming port operations to a seamless, paperless system by eliminating redundant procedures and duplications Federal Ministry of Transportation (FMoT) / NPA  Ports Development Phase:                 MDA to engage TA to prepare OBC Not Available
19 National Freight Intelligence and Transportation Hub (NAFITH): An application of information and communications technology in the management of transport problems. It seeks to leverage on new innovation to provide needed solutions to the teething transport problems in Apapa Federal Ministry of Transportation (FMoT) / NPA  Ports Development Phase:                    (Same as above) Not Available
20 Koko Port Concession: FGN seeks to grant a new Concession over this Port in 2017 Federal Ministry of Transportation (FMoT) / NPA  Ports Development Phase: Not Available
21 Ikorodu Lighter Terminal: The port is dedicated to salvage unclaimed or overtime containers in the ports, with a view to providing needed solutions to port congestions and pave way to smoothen the new concessionaire’s operations in the ports Federal Ministry of Transportation (FMoT) / NPA  Ports Development Phase:                 MDA to engage TA to prepare OBC Not Available
22 Provision of Utilities to the Ports: These include, but are not limited to the provisions of power and water Federal Ministry of Transportation (FMoT) / NPA  Ports Development Phase:                          (Same as above) Not Available
23 PPPs for improved service delivery at the following facilities:
  • Warri Dockyard
  • Lokoja Dockyard
  • Concession of Abam Ama Jetty at Port Harcourt
Federal Ministry of Transportation (FMoT)/ NIWA Ports Development Phase:                          (Same as above) Not Available
24 PPPs for improved service delivery at the following facilities:
  • Buoyage Vessels (B/V Anam at Onitsha)
  • Buoyage Vessels (B/V Bajibo at Lokoja, Kogi State)
  • Buoyage Vessels (B/V Nembe at Lokoja, Kogi State)
  • Buoyage Vessels (B/V Numan at Lokoja, Kogi State)
Federal Ministry of Transportation (FMoT)/ NIWA Ports Development Phase:                          (Same as above) Not Available
25 PPPs for improved service delivery at the following facilities:
  • Motor Ferry (M/F Calabar at Lokoja, Kogi State)
  • Motor Ferry (M/F Effiat Mbo at Lokoja, Kogi State)
  • Motor Ferry (M/F Donga at Makurdi, Benue State)
  • Water Bus (W/B) at Yauri, Kebbi State
  • 3 Nos. 40-45 Passenger Sitter Ferries at Lokoja, Kogi State
  • Water Hyacinth Clearing Equipment (Water Master Classic III at Onitsha)
  • 2 Nos. 40-45 Passenger Sitter Ferries at Lagos
Federal Ministry of Transportation (FMoT)/ NIWA Ports Development Phase:                          (Same as above) Not Available
26 PPPs for improved service delivery at the following facilities:
  • Marina Jetty at Lagos
  • Apapa Jetty at Lagos
  • Oyingbo Jetty at Lagos
  • Maraoko Jetty at Lagos
  • Abayomi Drive Jetty at Lagos
  • Osborne Jetty at Lagos
  • Calabar Jetty at Calabar
Federal Ministry of Transportation (FMoT)/ NIWA Ports Development Phase:                          (Same as above) Not Available
27
  • The Dagbolu Inland Container Depot (ICD) project concerns the development of a Greenfield ICD in Osun State, South-West Nigeria.
  • The ICD is being developed to exploit the strategic advantages in Nigeria’s huge export and import market by making the country a trans-shipment hub for the West African region.
Federal Ministry of Transportation / Nigeria Shippers Council (NSC) Inland Port Development Phase:            The Commission has issued OBC Compliance Certificate for FEC approval to be sought 1,072,480,000 Naira
28 Development of Container Freight Depot (CFD) in Ogwashi-Uku Delta State: This has a design that consists of an annual 5000 TEUs capacity facility which can be expanded with increasing throughput Federal Ministry of Transportation /NSC Inland Port Development Phase: This is an Unsolicited Proposal. The procurement of a TA is in progress
29 Development of Inland Container Depot (ICD) in Onitsha, Anambra State: This has a design that consists of an annual 5,000 TEUs capacity facility which can be expanded with increasing throughput. Federal Ministry of Transportation /NSC Inland Port Development Phase:                 The procurement of a Transaction Adviser has commenced 920,000, 000 Naira
30 PPP development of an Inland Container Depot (ICD) in Lolo, Kebbi State. Outline Business Case (OBC) received from the Nigeria Shippers Council (NSC) in respect of the unsolicited proposal developed by Deltatlantic Nigeria Ltd. Federal Ministry of Transportation / NSC Inland Port Development Phase:                Unsolicited proposal reviewed by ICRC, awaiting submission of revised OBC by MDA Not Available
31 Development of Inland Container Depot (ICD) in Nnewi, Anambra State Federal Ministry of Transportation /NSC Inland Port Development Phase:               The OBC was reviewed by ICRC and comments sent to NSC for revision. Not Available
32 Development of Inland Container Depot (ICD) in Benin, Edo State Federal Ministry of Transportation /NSC Inland Port Development Phase:                OBC reviewed and returned NSC Not Available
33 Development of Truck Transit park (TTP) in Obollo-Afor, Enugu State Federal Ministry of Transportation /NSC Inland Port Development Phase:                 MDA to engage TA to prepare OBC Not Available
34 Development of Truck Transit park (TTP) in Lokoja, Kogi State Federal Ministry of Transportation /NSC Inland Port Development Phase: (Same as above) Not Available
35 PPP Development of Abuja Mass Transit Rail Lot 1A and 3 projects for the FCTA in Abuja. Provision of rolling stock, additional stations, maintenance depots and operation the system. Federal Capital Territory Administration (FCTA) Rail Development Phase:                 OBC to be resubmitted to the Commission 32,647,000,000 Naira
36 Concession of the narrow gauge:
  • Eastern Railway (Port Harcourt to Maiduguri)
  • Western (Lagos to Kano) railway lines in the country.
  • FGN is considering an unsolicited proposal submitted by General Electrics to have a concession over the Western and Eastern Rail lines. The Nigeria Infrastructure Advisory Facility (NIAF), an arm of the United Kingdom Department for International Development (DFID), had also assisted the FGN in funding the preparation of an Outline Business Case (OBC) as part of the project development work for the concession of the railway lines.
Federal Ministry of Transportation /NRC  Rail  Development Phase:           An OBC has been submitted by GE and Government, and its advisiory team are reviewing the document  2,000,000,000
Dollars(950,000,000,000 Naira)
 
37
  • Lagos – Shagamu- Ijebu Ode- Ore- Benin City (300km) (standard guage).
  • Benin- Agbor-Ogwashi Uku- Asaba- Onitsha –Nnewi- Owerri-Aba with additional line from Onitsha-Enugu- Abakaliki (500km) (standard guage).
  • Ajaokuta(Eganyi)-Obajana-Jakura-Baro-Abuja with additional line from Ajaokuta- Oturkpo(533km) (standard guage).
  • Zaria- Funtua- Tsafe- Gusau- Kaura- Namoda-Sokoto-Illela-Birnin Koni (520Km) (standard guage).
  • Lagos -Ibadan- Oshogbo-Baro-Abuja (615KM) (high speed).
Federal Ministry of Transportation /Nigerian Railway Corporation (NRC) Rail Development Phase:           OBC’s are being prepared. Not Available
38 PPP development of Abuja Light Rail Lot 2 network route. The distance will cover 54.1 kilometers, from Garki Area 11 passing through the interchange centre at Eagle Square to Gudu, Nyanya, Karu axis, in Abuja. Federal Capital Territory Administration (FCTA) Rail Development Phase:              TA yet to be Appointed. Not Available
39 Rehabilitation, management and operation of the National Trade and International Business Centre, Lagos (NTIBC) Federal Ministry of Trade & Investment / Tafawa Balewa Square Management Board (TBSMB) Trade & Investment Development Phase:               TA has been procured and is currently preparing an OBC. 31,000,000,000 Naira
40 Establishment of the Mechanic’s villages to stimulate the growth and development of the mechanic business in a specialised and orderly manner. Federal Ministry of Trade & Investment/National Automotive Council (NAC) Trade & Investment Development Phase:               The OBC has been reviewed by ICRC and comments sent to NAC for revision and re-submission. 5,300,000,000 Naira
41 Development of 23 Industrial Development Clusters (IDCs) in 6 geopolitical zones. Federal Ministry of Trade & Investment/ Small and Medium Enterprises Development Agency of Nigeria (SMEDAN) Trade & Investment Development Phase:           Technical Committee to submit feasibility report. Not Available
42 Development for New Eko Project/Lagoon City, Lagos: An unsolicited proposal for the sand-filling and reclamation of water bodies within the vicinity of existing Banana Island, Lagos. Federal Ministry of Power, Works and Housing (FMPW&H)  Social/Urban Infrastructure (Housing) Development Phase:                 An OBC is being developed. Not Available
43 Marina Quayside Strip Development Project: A transformative urban / waterfront Project along the Marina axis in Lagos. It is intended to be a tourism centre that will provide hotels, condominiums, commercial complexes, recreation facilities, bus transport terminals, offices and residential buildings. Federal Ministry of Power, Works and Housing (FMPW&H) Social/Urban Infrastructure (Housing) Development Phase:                   The OBC was reviewed by ICRC and comments sent to MDA for revision. Not Available
44 Ship building yard with breaking, recycling technology and wreck identification and removal. Federal Ministry of Transportation / Nigerian Maritime Administration & Safety Agency (NIMASA) Maritime Development Phase:                 MDA to engage TA to prepare OBC Not Available
45 Management and operations of the modular/floating dry dock (outsourcing). Federal Ministry of Transportation / (NIMASA) Maritime Development Phase:           (Same as above) Not Available
46 Procurement of operational vessels, maritime patrol aircraft, coordination/surveillance centre and other operational equipment (Finance lease) Federal Ministry of Transportation / (NIMASA) Maritime Development Phase:           (Same as above) Not Available
47 Outsourcing of NIMASA’s Training Centre and Guest House at Nigerian Maritime Resource Development Centre (NMRDC), Kirikiri, Lagos state. Federal Ministry of Transportation / (NIMASA) Maritime Development Phase:           (Same as above) Not Available
48 PPPs to develop a Multilevel car park atNIMASA Headquarters Federal Ministry of Transportation / (NIMASA) Maritime Development Phase:           (Same as above) Not Available
49 Unsolicited proposal for Development of platform for pollution Federal Ministry of Transportation / (NIMASA) Maritime Development Phase:           (Same as above) Not Available
50 Verification gross mass imo solar- safety of life at sea Federal Ministry of Transportation / (NIMASA) Maritime Development Phase:           (Same as above) Not Available
51 Concession of  4 International Airports (Abuja, Lagos, Kano and Port Harcourt) Federal Ministry of Transportation Aviation Development Phase:           (Same as above) Not Available
52
  • Establishment of a Maintenance, Repair and Overhaul (MRO) Center
  • Development of Aerotropolis (Airport City)
  • Development of Cargo/Agro-Allied Airport Terminals
Federal Ministry of Transportation  Aviation  Development Phase:           (Same as above)  Not Available 
53 Production and management of Nigeria’s e-passport project, production of International Civil Aviation Organization (ICAO) compliant e-passport.  Federal Ministry of Interior  Immigration Development Phase:           OBC to be updated by Project Proponent. Not Available
54 Procure new correctional facilities in three (3) locations in Nigeria on a land (value) swap basis at Lagos, Owerri and Kaduna. Federal Ministry of Interior / Nigerian Prison Service Prisons Development Phase:                 MDA to engage TA to prepare OBC Not Available
55
  • Prison Integrated Farm Facility at Ozala (Edo State), Kujama (Kaduna State) and Lakushi (Plateau State).
  • Refurbishment of Existing laundry facility in Kuje and establishment of industrial laundry facility in other prison locations nationwide
  • Construction of Prison Officers Homes at various locations in Nigeria
  • The Aba Shoe Project, for production of made in Nigeria products
Federal Ministry of Interior / Nigerian Prison Service Prisons Development Phase:                 A prefered bidder has emerged as TA and negogiations are under way. Not Available
56 PPPs to develop the following projects:
  • Passengers Information System
  • ECOWAS Biometric Identification System
  • Information Verification System
  • Security Guards Biometric Data Collection, Verification and Authentic System
Federal Ministry of Interior National Security Development Phase: MDA to engage TA to prepare OBC Not Available
57 Construction of an ultra-modern forensic laboratory at the Police Headquarters Building in Abuja. Federal Ministry of Interior Security Development Phase:           MDA to engage TA to prepare OBC Not Available
58 Renovation and refurbishment of the Obalende & Falomo Police Barracks in Lagos. Federal Ministry of Interior Security Development Phase:           (Same as above) Not Available
59
  • Establishment of selected weapons and military equipment assembly lines
  • Establishment of Mobile Solar Powered Generating set
  • Production of Ballistic Vests and Procurement of Raw Material
Defence Industries Corporation of Nigeria Security Development Phase:           (Same as above) Not Available
60 Construction of staff housing estate, shopping complex and new House Officers’ (Doctors’) quarters Federal Ministry of Health / University of Port Harcourt Teaching Hospital Health Development Phase:                Procurement of TA has commenced. 9,000,000,000 Naira
61 Development of a tertiary medical facility (Abuja Medical Mall/City) on a greenfield site in Abuja to harness the potential of the private health sector and provide high quality alternatives to Nigerians who require specialist medical care in the country. Federal Ministry of Health Health Development Phase:                 MDA to engage TA to prepare OBC Not Available
62 Management of the Warehouse in a box project (Lagos and Abuja). For refrigeration of vaccines and subsequent distribution to needed locations. Federal Ministry of Health Health Development Phase:           Inception report has been submitted by TA Not Available
63 Increase of financial inclusion (FI) penetration rate in the country by providing banking services to the financially excluded population through NIPOST offices nationwide. Federal Ministry of Communication Technology / NIPOST  ICT  Development Phase:           (MDA TO engage TA to prepare OBC)  Not Available 
64 Pedestrian metal barriers on municipal roads: The project is for the repair and replacement of damaged section. This will also involve the development of new areas of expansion for the erection of new metal barriers within the Municipal area. Federal Capital Development Authority (FCDA) Social/Urban Infrastructure Development Phase:            (Same as above) Not Available
65 Construction of Automated Parking Centres in designated car parks in the Federal Capital Territory. Federal Capital Development Authority (FCDA) Social/Urban Infrastructure Development Phase: (Same as above) Not Available
66 PPP to develop corporate head office of Federal Housing Authority (FHA) in Abuja located at the Central Business District of Abuja. Federal Housing Authority (FHA) Housing Development Phase: (Same as above) Not Available
67 Development of new towns in Abuja at Kwali and Bwari Area Councils Federal Housing Authority (FHA) Housing Development Phase:           (Same as above) Not Available
68
  • Upgrading/rebuilding of National Stadium, Lagos
  • Completion of athletes’ hostel, Abuja
Federal Ministry of Youth and Sports Sports Development Phase:           Ministry seeking TA services Not Available
69 Construction of Council for the Regulation of Engineering in Nigeria Council for the Regulation of Engineering in Nigeria Housing Development Phase:           MDA to engage TA to prepare OBC Not Available
(COREN) head office complex in Abuja.
70
  • Upgrade of the ICT Laboratories/Business Centres in Federal Schools
  • Upgrade of existing libraries
  • Upgrade of vocational schools
  • Development of an International Conference Center
  • Construction of National Mathematical Centre-International Science Academy (NMC-IMSA)
Federal Ministry of Education Education Development Phase:           (Same as above) Not Available
71 National Mathematical Center Education Development Phase:           (Same as above) Not Available
72 Proposed construction of Students Hostel, 500-Units of Staff Housing, Roads & Drainages, Shopping Mall, Staff/Students Cafetria, Bio-gas Electricity Power plant and Poultry Farm Federal Ministry of Education / Federal University of Gusau (FUG) Education Development Phase:           (Same as above) Not Available
73 On-line application System for E-registration platform, Computation / compilation of Students results, E-Learning and web portal development Federal Ministry of Education / FUG Education Development Phase:           (Same as above) Not Available
74 Proposed construction of Vice Chancellor’s Lodge, Pro-Chancellor’s Lodge, Principal Officers’ Quarters, Senior Staff Housing,  Junior Staff Housing, External Electrification, Borehole & Overhead Tanks, etc Federal Ministry of Education / FUG Education Development Phase:           (Same as above) Not Available
75 PPPs to develop the following projects:
  • Waste to Wealth Management (Recycling) including Scrap Metal Plant
  • Solid Waste Management
  • Completion of Bamboo Processing Machine (Livelihood Enhancement through Bamboo Value-Chain Development, Lokoja, Kogi State.
  • Completion of renovation of structures and equipment at Forest Utilization Centre, Benin City
Federal Ministry of Environment Environment Development Phase:           (Same as above) Not Available
76
  • Establishment of Federal Ministry of Environment’s Clean and Green Campaign to end open defecation in public areas by 2019 by providing Public Toilets nationwide. Pilots to be in FCT public schools, motor parks and market places; and extended to 36 States.
  • Framework for Plastic Industry and other private sector companies to take plastic waste off streets by 2019
Federal Ministry of Environment Environment Development Phase:           (Same as above) Not Available
77 Development of a New Head Office for the Federal Ministry of Environment (to be completed in 2018) Federal Ministry of Environment Environment Development Phase:           (Same as above) Not Available
PPP PROJECT PIPELINE 2014

INFRASTRUCTURE CONCESSION REGULATORY COMMISSION

PUBLIC PRIVATE PARTNERSHIP PROJECTS PIPELINE

Pursuant to section 2(4) of the ICRC (Establishment. Etc) Act 2005, we hereby publish all Federal Government projects eligible for Public Private Partnership (PPP) contracts during the 2014 fiscal year. The projects are consistent with the transformation agenda of the President, His Excellency, Dr. Goodluck Ebele Jonathan, GCFR, and are being developed by relevant Ministries, Departments and Agencies (MDAs) of the Federal Government, line with the ICRC Act 2005, and the National Policy on PPPs (N4P).

2014 PPP Pipeline Project List

S/N

PROJECT AND DESCRIPTION

PHASE AND PROPOSED PPP MODEL

MDA

1. PPP High Voltage Transmission For TCNRefurbishment/Replacement where necessary of transmission assets measuring approximately 12,000 km of 330kv/132kv & 132kv/33kv primary/secondary substations. These projects are located nationwide. Build transfer(BT)Development/ Procurement Transmission Company of Nigeria (TCN)
2. PPP High Voltage Transmission For TCNCompletion of 60 ongoing 330kv & 132kv transmission lines and 330kv/132kv and 132kv/33kv substation projects. These projects are located nationwide. Build transfer(BT) Transmission Company of Nigeria (TCN)
3. PPP High Voltage Transmission For TCNNew projects for 10GW Grid System Capacity consisting of 61 new 330kv &132kv lines and 330kv/132kv & 132kv/33kv primary/ secondary substations together with multiple reactive compensation projects. These projects are located in Kainji, Birnin Kebbi, Gusau, Lagos, Jos, Gombe, Damaturu, Awka, Ugwuaji, Zungeru, & Kaduna. Build Transfer (BT), Build Own Transfer (BOT), Build Own Operate Transfer (BOOT) Build Own Operate (BOO). Transmission Company of Nigeria (TCN)
4. PPP High Voltage Transmission For TCNNew projects for 13 GW Grid System Capacity consisting of 40 new 330kv & 132kv lines and 330kv/132kv &132kv/33kv primary/ secondary substations together with multiple reactive compensation projects. These projects are located In Makurdi, Apir, North Bank, Igando, Ugbegu, Zungeru, & Kaduna. Build Transfer (BT), Build Own Transfer (BOT), Build Own Operate Transfer (BOOT) Build Own Operate (BOO). Transmission Company of Nigeria (TCN)
5. PPP High Voltage Transmission For TCNNew projects for 16 GW Grid System Capacity consisting of 32 new 330kv & 132kv lines and 330kv/132kv &132kv/33kv primary/ secondary substations together with multiple reactive compensation projects. These projects are located in Kano, Dutse, Damaturu, Jos, Samenaka, Asoada &Degema. Build Transfer (BT), Build Own Transfer (BOT), Build Own Operate Transfer (BOOT) Build Own Operate (BOO). Transmission Company of Nigeria (TCN)
6. PPP High Voltage Transmission For TCNNew projects for 20 GW Grid System Capacity consisting of 33 new 330kv & 132kv lines and 330kv/132kv &132kv/33kv primary/ secondary substations together with multiple reactive compensation projects. These projects are located in Mambila, Makurdi, Birnin Kebbi, Argungu, & Calabar. Build Transfer (BT), Build Own Transfer (BOT), Build Own Operate Transfer (BOOT) Build Own Operate (BOO). Transmission Company of Nigeria (TCN)
7. Concession Of The Multi-Purpose Components Of The Gurara 1 Dam, Kaduna State.This consists the Operation and Maintenance of about 1000 Ha irrigation infrastructure for commercial agriculture. Development Phase, Operate And Maintain. Federal Ministry of Water Resources
8. Bakalori Irrigation ProjectCommercial Farming on 23,000Ha through PPP.Bakalori Dam is located in Zamfara State. Development Phase, Rehabilitate, Operate And Maintain. Federal Ministry of Water Resources
9. Jibiya Irrigation ProjectCommercial Farming on 3000Ha of Farmland through PPP.Jibiya Dam is located in Katsina State Development Phase. Federal Ministry of Water Resources
10. Middle Rima Valley Irrigation ProjectCommercial Farming on 1,118Ha of Farmland through PPP. Development Phase. Federal Ministry of Water Resources
11. Dasin Hausa DamDasin Hausa is a dam project for the Benue River about 30km upstream from the city of Yola. The Federal Government wants to develop 150mw of electricity from this dam. Development Phase. Federal Ministry of Water Resources
12. Elele Prison FarmCommercial Farming on 2900Ha of Farmland through PPP. Development Phase. Federal Ministry of Water Resources
13. Tede DamGreenfield project with potentials for irrigation and hydropower. Development Phase. Federal Ministry of Water Resources
14  Peremabiri Irrigation and Land reclamationCommercial Farming on 1280Ha of Farmland through PPP. Development Phase. Federal Ministry of Water Resources
15. Owena Multi-purpose Dam Water supplyProvision of water treatment and reticulation via PPP Development Phase Federal Ministry of Water Resources
16. Development of the Marina Car Park and the Marina Water frontThe Marina Quayside Strip Project Seeks to develop the FG owned lands on Lagos Marina in a world class marina strip development with office towers, marinas, cruise handling facilities etc Development Phase Federal Ministry of Lands, Housing and Urban Development.
17. Redevelopment of the Ministry’s Land on St. Gregory Road, Onikan-Ikoyi, Lagos Development Phase. Federal Ministry of Lands, Housing and Urban Development
18. Development of Ministry’s Land behind the National Stadium, Surulere, Lagos. Development Phase. Federal Ministry of Lands, Housing and Urban Development
19. Reconstruction, Rehabilitation and Expansion Of Lagos- Ibadan Dual CarriagewayExpansion and Redevelopment of the 127km Lagos to Ibadan Expressway: Procurement PhaseReconstruction, Rehabilitation and Expansion is in progress via Traditional Procurement. Additional private sector finance required for completion, operation & maintenance. Federal Ministry of Works
20. Construction of a Bridge over River Niger at Nupeko, Niger State Development Phase. Federal Ministry of Works
21. Bodo Bonny road with a bridge across Opobo channel to the Island of Bonny in Rivers state Development Phase Federal Ministry of Works
22. Keffi-Akwanga-Lafia-Makurdi Road (Nassarrawa and Benue States) Development Phase Federal Ministry of Works
23. Lokoja- Ajakuta-Ogbulafo- 9thMile Road  Development Phase Federal Ministry of Works
24. Akwanga-Jos Road Development Phase Federal Ministry of Works
25. Dualisation of Enugu(9thMile)-Otukpa- Lokoja Development PhaseBuild Operate Transfer basis Federal Ministry of Works
26. Phase 1: 2ndLagos outer ring Road; Tin Can Island-Igando-Lagos/Otta road interchange-Lagos/Ibadan expressway Development Phase Federal Ministry of Works
27. Phase 2: 2ndLagos outer ring Road; Lekki-Ikorodu Shagamu/Benin Expressway. Development Phase Federal Ministry of Works
28. Abuja-Kaduna- Kano Dual Carriage way Development Phase Federal Ministry of Works
29. Lagos-Badagry-Seme Border Expressway Development Phase Federal Ministry of Works
30. Shagamu-Benin-Asaba Expressway Development Phase Federal Ministry of Works
31. River Benue Bridge @ Ibi, Taraba stateThis proposed bridge across River Benue at Ibi town is about 2.4km long and lies on the Jos – Shendam – Ibi – Wukari – Katsina Ala road. This bridge would replace current movement of goods and services across the river by motorized ferry. Development Phase Federal Ministry of Works
32. Ibom Deepsea PortAn integrated, multi-purpose deep sea port in Akwa Ibom State Development Phase Federal Ministry of Transport, Nigerian Ports Authority and Akwa Ibom State Government
33. Inland Container Depot, GombeDry Port in Gombe State Development Phase Federal Ministry of Transport and Nigerian Shipper’s Council
34. Greenfield Highspeed Land Railway Lines across Nigeria
  • Lagos –Shagamu- Ijebu Ode- Ore- Benin City (300km) (standard gauge)
  • Benin-Agbor-Ogwashi Uku- Asaba- Onitsha –Nnewi- Owerri-Aba with additional line from Onitsha-Enugu- Abakaliki (500km) (standard gauge)
  • Ajaokuta(Eganyi)-Obajana-Jakura-Baro-Abuja with additional line from Ajaokuta- Otukpo(533km) (standard gauge)
  • Zaria-Funtua- Tsafe- Gusau- Kaura- Namoda-Sokoto-Illela-Birnin Kebbi (520Km) (standard gauge)
  • Lagos –Ibadan- Oshogbo-Baro-Abuja (615KM) (high speed).
 
Development Phase Federal Ministry of Transport
35. Development of 23 Industrial Development Centres Across NigeriaRedevelopment of 23 Industrial Development Centres (IDCs) into Industrial Clusters Development Phase Federal Ministry of Trade & Industry (Small and Medium Enterprises Development Agency)
36. National Trade and International Business Centre Project.This project is a twenty-five (25) storey brown field project in Lagos.The facility built around 1959 occupies approximately 8,100 sq meters with a parking lot of 2,650 sq meters. The building is planned to be remodeled as an international business center. Development Phase Fed. Ministry of Trade and Investment (Tafawa Balewa Square Management Board)
37. National Stadium LagosRenewal of Facilities & Management of the national stadia by the private sector on PPP  basis Development Phase National Sports Commission
38. National Stadium Athletes Hostel, AbujaCompletion and management of Athletes Hostel Development Phase National Sports Commission
39. Calabar – Kano Gas PipelineThe Nigerian Gas Master Plan proposes major expansion of gas infrastructure to increase gas supply and delivery. Strategic pipelines will link the eastern and western gas networks and deliver gas to northern Nigeria Development Phase Federal Ministry of Petroleum Resources/ NNPC
40. National Theatre Masterplan Complementary Facilities Realization Four Star Hotel, Multi Level Car Park, High Rise Office Building, Theme/Aquatic Park and Theatre Restoration Development Phase Federal Ministry of Culture, Tourism and National Orientation/National Theatre Management
41. Abuja Medical MallProvision of World Class Medical Facilities and Services Development Phase Federal Ministry of Health
42. Development Of Mechanic VillagesThe project is aimed at developing the automotive value chain via the provision of 6 pilot modern mechanic villages in the nation’s 6 geo political zones. Development Phase Fed. Ministry of Trade and Investment (National Automotive Council)
43 Establishment of a Multimedia Centre in the FCTA one stop shop for film production in the FCT, consisting of studio, sound stage, post production/editing facilities, a world class Cineplex for screening of films, theme parks, five star hotel, recreational facilities, corporate office, resource persons guest house and duplicating and replicating facilities. Development Phase Nigerian Film Corporation
44 Development of Film Screening TheatresA total of 300 – 400 community based screening centres will be developed in the 36 States of the federation and Abuja. These include furnishing and equipment – each will have four screening rooms, restaurant, refreshment area, concessional areas film sales and distribution offices covering an average of 2 – 4 plots, including parking and security. Development Phase Nigerian Film Corporation
45 Upgrade of the Corporation’s Lagos Office Studio and Mini Theatre for Commercial Purposes.The studio and theatre at the Lagos office will be up graded along with recreational facilities, a guest house and other auxiliary services. Development Phase Nigerian Film Corporation
46 The Establishment and Take- ff of the Film Industry ComplexThe complex will be situated at Shere Hills Jos on the Corporation’s permanent site which measures 160 hectares with C of O since 1983. It will serve as the Corporate Head office of the NFC. Development Phase Nigerian Film Corporation
47 Upgrading of Auditorium to International Screening Standard at NFIThe present NFI auditorium will be up graded to a screening theatre for the purpose of commercial screening. Development Phase Nigerian Film Corporation
48 Establishment of 3 Film Villages at Miango Plateau State for which 400 hectares of land have been set aside at Akwa Ibom and Ibadan.These are ‘one stop’ film destinations of the highest international standards with all the offerings of such facilities including; studios, sound stages, post production facilities, theme parks, hotels, cineplex and recreational facilities. Development Phase Nigerian Film Corporation
Further information on the PPP projects listed in this publication may be obtained from the respective MDAs.

Please note that both 2013 and 2014 PPP Projects Pipeline lists can be viewed on the ICRCWebsite:www.icrc.gov.ng

Signed

Aminu Diko

Director General/CEO

PPP PROJECT PIPELINE 2013

2013 PPP Pipeline Project List Up-Date

S/N

PROJECT AND DESCRIPTION

PHASE AND PROPOSED PPP MODEL

MDA

1

2nd Niger BridgeA Greenfield bridge and associated approach access road over the River Niger connecting Asaba and Onitsha. -Implementation Phase-Build Operate Transfer

Fed. Min. of Works

2

Rehabilitation and Upgrade of the Murtala Mohammed International Airport (MMIA) Road to Apakun Junction, Lagos

Expansion of MMIA access road from a 4-lane dual carriageway to an 8-lane road with vehicular and pedestrian bridges at appropriate locations

-Procurement Phase: Selection of preferred bidder concluded- Build Operate Transfer basis

Fed. Min. of Works

3

Rehabilitation and Upgrade of Lagos – Iseyin – Kishi – Kaiama Road

The Lagos – Iseyin – Kishi – Kaiama Road, Lot IA – will provide direct connectivity between Lagos and the North-West Zone. The road passes through Kaiama in Kwara state to link a new alignment (Lot IB) at Bahana, in Niger State. Road is approximately 450 km long.

-Development Phase: Outline Business Case Preparation.- Build Operate Transfer basis

Fed. Min. of Works

4

Rehabilitation and Upgrade of Kaiama-Bahana-Kaoje-Gwanbe- Fokku-Sokoto Road

The Kaiama-Bahana-Kaoje-Gwanbe- Fokku-Sokoto Road (New Alignment) completes the connection between Lagos and the North West Geo Political Zone. The road passes through Kaiama in Kwara state to link Bahana a border town in Niger State and Kaoje in Kebbi State and terminates in Sokoto town. This new alignment road (Lot 1b) is approximately 650km long.

-Development Phase: Outline Business Case Preparation- Build Operate Transfer Basis

Fed. Min. of Works

5

River Benue Bridge @ Ibi, Taraba state

This proposed bridge across River Benue at Ibi town is about 2.4km long and lies on the Jos – Shendam – Ibi – Wukari – Katsina Ala road. This bridge would replace current movement of goods and services across the river by motorized ferry.

-Development Phase: Outline Business Case preparation- Build Operate Transfer basis

Fed. Min. of Works

6

Dualization of Enugu (9th Mile) –Obollo Afor –Otukpo-Makurdi Road:The 9th Mile-Otukpa-Otukpo Road is a 119km long single carriageway road from the Enugu – Onitsha Dual Carriageway at 9th Mile Junction connecting Obollo Afor to Otukpa Junction in Benue State and intersecting the Lokoja – Otukpo Road. -Development Phase:Outline Business Case preparation- Build Operate Transfer basis

Fed. Min. of Works

7

Rehabilitation and Dualization of Ilorin-Jebba-Mokwa-Tegina-Birnin-Gwari Road

Rehabilitation and dualization of the existing 233km single carriageway trunk road (National Route No. R20) from Ilorin in Kwara State to Birnin-Gwari, Kaduna state.

-Procurement Phase:Outline Business Case preparation- Build Operate Transfer Basis

Fed. Min. of Works

8

Upgrade, Operations and Maintenance of Federal Government of Nigeria (FGN) Agro-Value Chain Infrastructure CentresScope consists of 18 Nos. Agro-Industrial Estates, 8 Nos. Agro-Processing centers and 9 Nos. Farmers Markets. Aim is to provide for greater private sector participation in the Agricultural Transformation Agenda. The facilities are located across the 6 geo-political zones of the country. -Procurement Phase: Engagement of Transaction Advisers in progress Fed. Min. of Agriculture

9

Development of Mechanic VillagesThe project is aimed at developing the automotive value chain via the provision of 6 pilot modern mechanic villages in the nation’s 6 geopolitical zones. -Development Phase:Outline Business Case preparation Fed. Min of Trade & Investment (National Automotive Council)

10

Upgrade and Modernization of Kiri Kiri Lighter Terminals 1 and 2, in LagosScope is significant modernization, operations and maintenance of the existing Kiri Kiri lighter terminals 1 and 2 on PPP basis. -Procurement Phase:Engagement of Transaction Adviser completed. PPP procurement activities in progress.-Rehabilitate Operate Transfer basis Fed. Min. of Transport and the Nigeria Ports Authority

11

Operations and Maintenance of Onitsha Inland Water Port in Anambra StateEngagement of a competent private sector partner to operate and maintain the recently completed and commissioned inland port. -Procurement Phase:Engagement of Transaction Adviser completed and PPP procurement activities in progress.-Operate Maintain  Transfer basis Fed. Min. of Transport/National Inland Water Authority

12

Operations and Maintenance of Western and Eastern NRC Narrow Gauge RailwayEngagement of a competent private sector partner to supply additional coaches and wagons and operate/ maintain post rehabilitation the Eastern and Western network of the Nigerian Railway Cooperation. -Procurement Phase:-Supply Operate and Maintain Fed. Min. of Transport/Nigerian Railway Cooperation

13

Abuja District Infrastructure Project Mabushi, DistrictsFinancing, construction, operation and maintenance of urban engineering infrastructure starting with Mabushi, district of Abuja. -Procurement Phase:   Procurementof concessionaire awaiting approval. Federal Capital Development Authority ( FCDA) /Federal Capital Territory Administration (FCTA)

14

Abuja Mass Transit Railway Lot 2 (Red Line)Development and operation of lot 2 of the Abuja Mass Transit Railway system. The red line is circa 54 km long and commences from Garki to the interchange centre at the Eagle Square in the Central Business District, and spans to Nyanya – Karu axis of the FCT. It also goes to sector centre D through Hilton Hotel, Gwarimpa FHA Estate and the light railway Lot 1 (Blue line currently under construction). -Development Phase:- Build Operate Transfer FCDA/FCTA

15

FCT Roads Network Development and Modernization covering the following roads
  1. Umaru Musa Yar adua Airport Expressway completion
  2. Outer Northern Expressway (ONEX) completion
  3. FCT Road 105
  4. FCT Road 106
– Development PhaseViability and Options review FCDA/FCTA       

16

Concession of Strategic Grain Reserve Silo facilities:Scope consists of 33 Nos. silos complexes located across the country -Development Phase: Procurement of Transaction Adviser in progress. Fed. Ministry of Agriculture and Rural Development

17

Development of 45MW of Hydropower from 10 different small & medium dams :Lot 1(10MW Oyan Dam Ogun State, 6MW Ikere Gorge Dam Oyo State and 450KW Owena Dam Ondo State)Lot 2(3MW Bakolori Dam Zamfara State, 500KW Kampe Dam Kogi State and 1MW Doma Dam Nasarawa State)Lot 3 (4MW Jibia Dam Katsina State, 300KW Zobe Dam Katsina state, 10MW Tiga Dam Kano state and 10MW Challawa Dam Kano State)
  • Development Phase
Preparation of outline business case in progress
Fed. Ministry of Power

18

Concession of the Multi-purpose components of the Gurara 1 dam, Kaduna State:This consists of the concession for the hydropower, irrigation, water supply and other components of the dam
  • Development Phase
Preparation of outline business case for the irrigation and hydropower components in progress.
Fed. Ministry of Water Resou